High Quality Steel Ringlock Scaffolding for Working Platform or Support System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Color:

silver, dark red, blue





Product type:

thickness of scaffolding pipe

Lifespan:

5-7 years

Technology:

auto welding

Production lead time:

10-30 days

Payment term:

TT, LC

Delivery term:

FOB, CIF

Business type:

manufacturer

Packing:

in bulk, in bundle, in pallet

OEM service:

available

Packaging & Delivery

Packaging Detail:in bulk, in bundle, in pallet or as your request
Delivery Detail:10 to 30 days after order confirmation

Specifications

1)EN12810,SGS certificate 
2)High safety, stable, durable 
3)Finishing:HDG,Gal,Paint,Powder coated 
4)Real factory

High Quality Steel Ringlock Scaffolding for Working Platform or Support System

Product Description

 

NameRing Lock scaffolding
Place of Origin
Brand name
SizeØ48.3*3.25*1000/2000/3000 or as your request
Main MaterialQ235, Q195, Q345
Surface TreatmentHDG, dip painting, galvanize
ColorSilver, Dark red
CertificateSGS, EN12810.
FeaturesAutomatic Welding
ServiceOEM Service available
MOQ500pcs
PaymentT/T
Delivery Time10-30 days after confirmation
PackingIn bulk/In bundle/As your request
Production capability100 tons per day


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:industrial/scaffold piercing question?
id leave it. theyre hard to heal nyway,and the added pressure of the helmet and the sweat and the possibility of getting hit in the head and knocking the piercing....well, i wouldnt risk it
Q:Bracket cast in situ beam bracket must use bowl buckle scaffold
3.1.2, clearly defined the quality requirements of fasteners, so you can use fasteners
Q:The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
New Jack only likes to beat up fat guys (Vic Grimes) and old men (Gypsy Joe). I don't think he'd want to try messing with Cena lol
Q:Is my scaffold peircing ok? x?
u shud check f its swollen and if there is more painin go to the doctors
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
A set of how much money a day, of course, there are some monthly price calculation
Q:I have a contract to paint a six story hotel. Problem the roof has an aluminum skirt. Can scaffolding be used?
Scaffolding and Cherry picker is your best option.
Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:Industrial / scaffold piercings - pierced with rings?
That is true, but it's an even worse idea to have an industrial done with rings. This is because your body can move your piercings slightly, to accommodate the angle that works best for your body. In general, that's not a bad thing, but with industrials, it's a problem. You may find that an industrial healed with rings may not accommodate a bar well; the piercing may heal unaligned, and wearing a bar could be painful or impossible. Plus any shop that thinks changing from rings to a bar at 6 to 8 weeks will make any difference from getting a bar initially, you shouldn't trust to poke needles in you. Industrials take 6 months to a year or more to heal. At 8 weeks, the piercings are still very much healing. So if you have your jewelry switched at that point, you'll be irritating the piercing, setting back healing, and you'll have to deal with all of the pressure and hypertrophic scarring problems anyway. It basically comes down to this, industrials suck to heal. Bars are hard to heal. But rings will often result in bad industrial placement and alignment. Just get pierced with a bar and deal with the problems as they come. It's still very much possible to heal an industrial, it just takes time, patience, and a really good piercer (and like I said find a better shop, whoever told you it'd work to change the jewelry from rings to a bar at 8 weeks is an idiot).
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range