High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide

Ref Price:
$300.00 - 1,000.00 / pc
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
3 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Name: High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide

1.    Specification

1. Material: Plate body S35C steel, tungsten carbide E5 grade ,

2. Lifetime: 30,000~80,000cbm

3. HRA≥86

4. Germany Welding rod used for hardfacing    

5. tensile strength ≥ 2500 N/mm2

6. Application: trailer and trunk mounted Mitsubish Pump

 Notes: total series of High Quality Sany Spectacle Wear Plate Tungsten Carbide for different brand concrete pump (PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO,Niigata Etc) available from us.

 

2.  Application

Our HiHigh Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc

Aiming at the largest concrete pump parts manufacturer, and reliable, professional supplier in China, we can supply concrete pump elbows, delivery pipes, casting or forging couplings, end rubber hoses, rubber pistons, tungsten wear plates, delivery cylinders, and other hydraulic parts, one stop service for your concrete pump parts and accessory business.

3.  Package

Every 60pcs High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide put in one seaworthy wooden box, and 20 boxes in one 20feet container.

 

FAQ:

Q1: Why buy Materials & Equipment from us?

A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide according to customers request?

A4: Yes, we can produce High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide according to the difference country situations and different concrete  pump to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:We have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

 

Image:

 

High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide

 

 

High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide High Quality Mitsubishi Spectacle Wear Plate Tungsten Carbide

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between concrete pump and ground pump?
Ground pump only conveying function, the price is cheaper, and now are used to transport mixing machine, the ground pump is a bit uneconomical
Q:What are the performance characteristics of concrete pump?
The use of advanced S pipe distribution valve, automatic compensation for wear clearance, good sealing performance
Q:How is the piping of the concrete pipe designed?
In the same line, should transfer the same diameter concrete pipe; at the same time, using the new 1 pipe section, should be the new arrangement of the tube in the pump delivery pressure is larger; pipes should be arranged vertically
Q:How much is the pump for a month?
In the mud, the price is about 25 yuan per square, according to my experience, more than 175000 points per month can pump 7000 yuan, totaling $
Q:How to diagnose the blockage in the inlet of concrete pump?
The feed port is blocked and the pump operation and hydraulic system are normal, with no abnormal sound and vibration. The hopper has larger aggregate or agglomerates and is stuck or arched at the feed port
Q:What are the fittings of concrete pump?
The commonly used electrical accessories (button switch, switch, trip circuit breaker, transformer terminals, etc.), hydraulic pipe
Q:How does the concrete pump work?
The construction of automobile chassis, internal combustion engine, air compressor, water pump, hydraulic device, etc., which constitute the concrete pump truck, shall be operated in accordance with the safety instructions of the horizontal transport machinery, power plant and hydraulic machinery respectively
Q:If the concrete pump valve jam how to judge and deal with?
When the pipe is blocked, the pump shall be taken repeatedly, reversing the pump, and gradually pump the concrete at the pump's outlet back to the hopper and mix again
Q:What are the types of concrete pumps?
The pump body and the conveying pipe are made up of. It is divided into piston type, extrusion type and water pressure diaphragm type according to the structure
Q:How to calculate the power of concrete pump motor?
First of all, the length of the pipe and pipe diameter and the motor power is basically nothing to do!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range