High Quality Lift pipe clamp Lift pipe clamp

Ref Price:
$1.11 / watt
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
1000 watt
Supply Capability:
100000 watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

High   Quality  Lift  pipe  clamp  Lift  pipe  clampppr fittings HYOSUNG PPR raw materials standard:DIN8077-8078            GB/T18742.3-2002             PN25            White grey green color

1.Material:Random Polypropylene(Hyosung R200P); 
2.ISO9001&ISO14001; 
3.Standard:GB/T 18742.3-2002, DIN8077/8078; 
4.OEM also ok

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:TTP-PESI hole net steel belt composite pipe fittings need to be taken?
The wire mesh and steel band composite plastic pipe is one of the achievements in the Ministry of construction's scientific and technological achievements. As a transportation pipeline, it can be widely used in petroleum, chemical, pharmaceutical, mining, municipal engineering and so on.
Q:Indoor plastic water supply pipe, 20 of the 20 refers to the inside diameter or outside diameter?
For the performance indexes of the pipes are quite strict, especially in drinking water, with no need for pipeline without radiation, does not contain harmful substances such as heavy metals, better corrosion resistance, longer service life etc..
Q:PE is the hot melt?
1. When using this method, the hot melt butt welding machine is adopted, and the main operation steps are as follows:After the butt welding machine has been debugged, put the pipe to be placed on the welding jig and clamp;The cleaning pipe end to be connected and connected with two end milling cutter alignment docking, the displacement is not greater than the pipe wall thickness of 10%:When the temperature of the heating plate reaches the set temperature, put it on the heating plate:After heating, take out the heating plate, quickly start the oil pump pressure, join the two pipe heating surface, and step up to the welding pressure, keep pressure and cool down:After cooling to the specified time, open the clamp and remove the pipe from the rack, observe the roll edge, determine the quality of the connection, and complete the connection.2. Check the quality of hot melt butt jointThe determination of the quality of hot melt butt welding is still mainly concerned with nondestructive appearance inspection of welding roll edges. Usually includes edge geometry and cutting edge visual inspection, the edge to behind the buckling to prove that connected with no lack of fusion check.Ultrasonic testing and X ray examination have been applied abroad.Destructive detection. Tensile test, bending test and tensile creep test are carried out at the interface respectively.3, hot melt docking notes:The procedures for the use of the docking machines and the matters needing attention shall be observed;Operators must wear gloves, wear overalls, do a good job of self-protection, to avoid electric shocks or burns;Heating the surface of the board, and the connecting ends should be kept clean:Docking pressure should be adjusted to the actual needs of the site:Polyethylene pipes shall not be heated by open flame;The welding interface to protect from sand and rain hit.
Q:Are the elbow and three - pipe fittings installed in the water supply and drainage pipes included?
Indoor heating plastic pipe, aluminum-plastic composite pipe, stainless steel pipe, copper pipe installation project, the pipeline joint parts as materials, according to design drawings to determine the number and loss of 1% of the cost of materials shall be calculated separately.
Q:Antistatic flame retardant PE plastic pipe installation?
1 、 cut the pipe according to the required length, remove the burr of the pipe port and chamfer 30 degrees.2. Insert the pipe into the bottom of the pipe mouth and mark it at the interface of the pipe and the pipe. Then mark the tube out of the 10mm with this mark. Make second more marks. Clean the outer side of the pipe and the inner side of the pipe. Apply a lubricant (not oil or grease).3. The special rubber sealing ring is coated with lubricant and put into the pipe groove, and the pipe is directly inserted into the pipe fitting to the second mark.
Q:Can steel wire frame plastic composite pipe be connected with normal elbow?
What do you mean by a normal elbow?. All kinds of pipes have their own fittings, this should not be a problem. Our steel skeleton plastic composite pipe is such, there are all kinds of elbow, three pass, variable pipe fittings supporting the use of.
Q:What is the plastic pipe joint of water supply pipes?
This depends on what kind of plastic you use, for example, you want PPR that connector is PPR pipe fittings
Q:PE how about the installation of plastic pipes?
Measures should be taken to protect or adjust the connection process under cold weather (--5 degrees below) and strong wind conditions
Q:ABS, rubber, resin, pipe made of three kinds of material. Which kind of hardness, electricity, heat insulation is good?. Can that material be used as tubing and heating fittings?
Rubber is divided into natural rubber and synthetic rubber according to its raw material. The yield of synthetic rubber has greatly exceeded that of natural rubber, of which the largest yield is styrene butadiene rubber. Rubber is the basic raw material of rubber industry. It is widely used in making tyres, rubber hoses, tapes, cables and other kinds of rubber products.
Q:TTP-PESI hole net steels belt composite pipe fittings need to be taken?
The wire mesh and steel band composite plastic pipe is one of the achievements in the Ministry of construction's scientific and technological achievements. As a transportation pipeline, it can be widely used in petroleum, chemical, pharmaceutical, mining, municipal engineering and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range