• High Polymer Water Emulsion Waterproof Coating System 1
  • High Polymer Water Emulsion Waterproof Coating System 2
High Polymer Water Emulsion Waterproof Coating

High Polymer Water Emulsion Waterproof Coating

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
5000 kg
Supply Capability:
20000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Coapolymer Water Emulsion Waterproof Coating Description:

Polymer modified asphalt waterproof coating is a series of the floorboard of the modified asphalt waterproof coating. But  the best effect is  the optimal ratio of all the SBS modified asphalt waterproof coating. Polymer SBS modified asphalt waterproof coating uses asphalt as the main raw material, with water as dispersion medium, with SBS and APP modified agent to modified emulsified asphalt, and add a variety of additives and SBS modified asphalt waterproof coating made of polymer.Polymer modified asphalt waterproof coating has good weather resistance, heat resistance performance, and can be directly worked in damp and grassroots bond well with grassroots .Also,it has the advantages of  non-toxic, no pollution, simple construction, etc.

2.Main  Features of Coapolymer Water Emulsion Waterproof Coating:

Suitable for construction, moistureproof of municipal engineering,

Used for waterroofing between the floors, especially is used for roofing maintenance works, cold operation.

No polluting the environment.

3.Coapolymer Water Emulsion Waterproof Coating Specification: 

Imperviousness0.1Mpa 30min no water leaking
Solid content

≥45%

Bond Strength

≥0.30

Mpa
Time of Surface Dry

≤8

h
Time of Actual Dry

≤24

h

4.Coapolymer Water Emulsion Waterproof Coating Images:

High Polymer Water Emulsion Waterproof Coating

 

 

Q:Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
Second, the chisel in addition to the wall structure to the wall structure for waterproof construction, you can use the material coating, membrane and infiltration of crystallization, the quality is different.
Q:Slope roof drains do not need to be waterproof
In addition, according to conventional settings vertical and horizontal sub-grid, complex structure easy to leak.
Q:Eastern rainbow waterproof how to do
General family bathroom is brush JBL waterproof coating, buy back to the first dilution, and then clean up the ground with brushing uniform brushing, the bathroom should brush the ground and the wall 1.6 meters high,
Q:Cabinet is to buy finished products, or directly to the decoration company to do?
Do the cabinet can be in accordance with your size, finished cabinet moldy, which is not necessarily. You have to buy some of the Well
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
Can not If the roof of a large area of ??leakage or a number of water leakage points, the first professional staff to check whether the cracks, the first to deal with leakage cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, you can also shop On the insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Do not use the roof of the insulation board, you can consider the use of steel mesh mixed soil. Wall cracks caused by cracks in the water, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction. Large cracks can be used to plug the king, a small crack can be used to seal the glass glue, repair with a wall waterproofing agent, after spraying a few words on it.
Q:What are the key points and contents of the quality control of waterproof material?
4, high-polymer modified asphalt waterproofing membrane: check the counterfeit effective and simple method is to cut the film wrapped down and then placed in the refrigerator freezer placed 3 hours after the removal, gently forced to break will be broken, and the national standard Require material low temperature flexibility to reach -20 ℃.
Q:Hello, roof with SBS waterproof material bulk density is how much?
Similar to styrene-butadiene rubber, SBS can be in contact with water, weak acid, alkali, etc., with excellent tensile strength, surface friction coefficient, low temperature performance, excellent electrical properties, good processing properties, as the current consumption of the largest thermoplastic Elastomer.
Q:Can acrylic materials be perforated? How to do waterproof after punching?
Or in the back with glass adhesive paste anti-corrosion nine PCT board (if the hole is flat, Anti-corrosion nine PCT is to remove the other side of the paste surface with asphalt anti-corrosion paint brush)
Q:What is the difference between finished mortar and cement mortar?
Finished mortar is good, easy to mix, is conducive to the improvement of masonry and work efficiency; cement sand waterproof, suitable for wall paste wall, wall light
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords