High Medium Voltage Drive 4.16KV 500KW RMVC4000-A040/630 VFD

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Energy-saving Solutions for Enterprise
1
Program Overview
Saving energy achieves 10% -70%
The enterprises do not need to pay for expense of equipment manufacture and installation.
Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)
Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1
)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility
2
)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3
)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4
)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5
)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2
Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3
Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The inverter is running independently
Frequency conversion regulator is the application of frequency conversion technology and microelectronics technology, by changing the motor operating frequency mode to control the AC motor power control equipment. The inverter is mainly composed of rectifier (AC variable DC), filter, inverter (DC variable AC), brake unit, drive unit, detection unit micro-processing unit and so on. The inverter will adjust the voltage and frequency of the output power supply according to the breaking of the internal IGBT, and provide the required power supply voltage according to the actual needs of the motor, so as to achieve the goal of saving energy and speeding.
Q:Inverter alarm a043, how is it
When a signal failure occurs, use the DTI board, if necessary, change P215. With P806 (Follow the parameter description) during operation can be converted to no encoder operation A043 is: n-actjump exceeds the allowable change speed of the speed encoder signal (P215) In addition, for the synchronous motor (P095 = 12): The motor speed is 2% higher than the inverter release time point. The inverter in the ready state can not exit. Check processing: Check if the cable is disconnected Check the tachometer to shield the ground Not only on the motor side but also on the inverter side The encoder cable does not allow disconnection Use only recommended encoders The encoder cable is not allowed to be laid with the power cable
Q:How is the notebook with a power adapter?
Clear use: Home use and office with the laptop power adapter to buy a home (AC), the car with the laptop power adapter, to buy a car, you want to use the aircraft on the basis of the car with a The aircraft head on it. Home, car, plane, want to take into account, to buy a two-in-one, or three in one. But if you do not want a few bags of computer weight, you can put a home, put a car, the office put a, so you can not bring to bring, plug to plug, more convenient, you can also give people around
Q:Laptop warranty period is not over, the power adapter is broken, repair money?
Warranty warranty, what is the warranty, that is broken, to ensure that free repair to you, repair bad on the new Dealers are not responsible for sale, need to go to a dedicated service network. Warranty period, should not be money. If the money, the first 800 to ask to say clearly
Q:Laptop power adapter output voltage is not the same as the current? What's the effect?
I would like to elaborate on the basic principle of the large standard current power supply can replace the small standard current power supply. Some friends have misunderstood, that a large nominal current power will burn books, because the current big thing. In fact, how much current in the same voltage depends on the load, that is, the work of the books, when the books of high-load operation, the current larger, the books into the standby time, the current is smaller, in short, On the voltage divided by the equivalent resistance of the books. Large nominal current power supply has enough current margin, will not be replaced by a small standard current power supply after the overheating or output voltage is too low. On the contrary, with a small current power supply instead of high current power on the existence of the above risks. But some friends with 56w power supply instead of 72w with no problem, because the power adapter is usually designed to leave a certain margin, the load power should be less than the power supply,
Q:If it is 8-pole variable frequency motor, enter the motor nameplate parameters in the inverter input for the 4 pole can?
Motor brand above all, the general number of wrong is the inverter shows the speed is not right, for the speed control requirements are not high places will not be a problem, you can use
Q:In the official website to buy ThinkPad notebook, to the power adapter?
Tak City gifted, genuine low, 7 days unconditional return. 300 brand-name notebooks for you to choose.
Q:My laptop can not use the power adapter, and can only use the battery, how is it ah,
Depending on your question may be the problem that the laptop's internal lines may be short-circuited 1, you can go to the video online to find the same type of machine disassemble video and then repair their own 2, get to the maintenance of the place to get on nothing
Q:I have a 5.5 kilowatts of 4-pole motor, want to pass through the inverter, slow down to 130 per minute use, eliminating the need for speed,
wo recommendations, the first, the use of vector control of the inverter, you are expected to run the frequency of about 5Hz, this time, ordinary V / F inverter output torque may be small, not necessarily meet the requirements, of course, if it is High-end imported inverter, the problem should be small, with the domestic vector inverter, the frequency can also be full torque output;
Q:Why the number of motor poles increased, the inverter capacity will increase
The number of poles of the motor is not directly related to the rated current, but the number of poles is larger and the power factor is lower and the rated current will be higher.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range