High Medium Voltage Drive 4.16KV 3000KW VFD

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Energy-saving Solutions for Enterprise
1、Program Overview
◆Saving energy achieves 10% -70%
◆The enterprises do not need to pay for expense of equipment manufacture and installation.
◆Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
◆According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)。
◆Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility。
2)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2、Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3、Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Three sets of batteries (540V) DC power supply U / f inverter.
It is estimated that the battery should be string - and - series connection method, and then rectifier part of the converter (which may also be caused by the switch) is actually a series of diodes in series, positive and negative after the reverse is actually the battery is Negative shorts, resulting in burning, as to burn only one of the group of a few cells, it should be string - and - string and that group, because the parallel to bear it double voltage.
Q:How to lift Yaskawa inverter base blockade?
Unlock the base block of Yaskawa inverter: 1. If the Yaskawa inverter reported that the base blockade, we should first check the cause, parameter settings in strict accordance with the recommendations of professional engineers to set.
Q:Laptop computer about electricity no electricity, is the power adapter problem?
This situation is definitely not about what power off, if it is really about electricity no electricity, then your laptop is a one-time shutdown, rather than the screen flashing. I think this situation is more like a laptop screen lamp problem. Is unlikely to be a power problem. The screen flashes from the surface that there may be enough current. If the adapter can not provide enough current for the notebook, then the notebook will be over-current protection, which automatically shut down. You can find an adapter with the same output voltage as your adapter, the output power is greater than or equal to your adapter other adapter, if the situation remains the same, then it is certainly the problem of the lamp. But the inferred will not be a power problem.
Q:Short-term short-circuit converter DC link positive and negative will damage the inverter?
the switch signal Is the fan running up after the speed line is low, this can be shorted. Pulse is every turn a circle, send two pulses to the speed line
Q:The emitter E of the inverter inverter module and the AC output U are not directly connected together
Pairs of modules are connected in a phase branch The phase output is derived from the neutral point between the modules
Q:My motor is a low frequency 8 pole motor, about 80W. I would like to choose a frequency converter
VACON frequency converter (Finland wholly owned) Model: NXL 0006 2 C1N1 Parameters: Low overload Continuous current: 6.6A 110% Overload current: 7.2A 110% Overload power: 1.5kw (ambient 40 ℃) High Overload Continuous Current: 4.8A 150% Overload Current: 7.2A 150% Overload Power: 1.1kw (Ambient 50 ℃) Maximum current: 9.6A Weight: 2.0kg Mechanical specifications: 84 x 220 x 172 Please consult the pre-sale technical support department
Q:Laptop adapter heat
Many friends to buy a laptop or laptop power, you may encounter the power did not take long to heat on the hot, and even hot to dare not get the situation, in the end is the quality of power problems or how is it? With the ever-changing notebook frequency, notebook power adapter power is also sesame flowering high, even to 100W or so, almost a small desktop power! Touch the hand, timid may be scared, obediently, is simply a hot potato! What will not fire? This is a lot of people worry! Compaq, IBM, such a large company to recover several back to the power adapter, it is because of fear that there may be defects due to power supply design, and will cause a fire!
Q:55 瓩 4 pole motor with a frequency of one hour can save much electricity
it is used in the fan pump load can save about 14-22 kWh, used in the general category, on Multiply your number by 55.
Q:How to disassemble the notebook power adapter
4, between the shield and the circuit board is also separated by a layer of thick plastic film, and then cut off the knife after the United States, you can see the circuit board "Lushan true"
Q:The relationship between the power supply of the notebook and the battery
1, when the notebook battery is fully charged, and connected to the power adapter, usually by the adapter directly to the host power supply, this time the battery is idle, the adapter power supply without battery conversion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range