High Medium Voltage Drive 3KV 4000KW VFD

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Energy-saving Solutions for Enterprise
1、Program Overview
◆Saving energy achieves 10% -70%
◆The enterprises do not need to pay for expense of equipment manufacture and installation.
◆Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
◆According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)。
◆Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility。
2)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2、Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3、Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Siemens g120 inverter torque limit what is the meaning
For example, you have 100kg of power, but you can send the power and you lift the weight of the object, if the object weight of 10kg, you can only use 10kg of power.
Q:My Lenovo v450 laptop power adapter should be bad how to match?
Hello, this is not recommended to go online to buy. The original is too expensive, generally with the domestic voltage instability may occur, so I suggest you go to the computer city to buy. Generally good quality, to about 120. The The As for the model, you can look at the output power, or you take your bad adapter to go, people see a look. The The The You can use a few years no problem, power adapter this kind of thing, online to buy the replacement is not convenient. The Hope to help you
Q:Laptop power supply 20V 3.5A can use 20V 4.5A power adapter Mody, what impact?
It's ok. As long as the voltage is appropriate on the line. Current value refers to the maximum current that can be output. How much depends on your computer. Or, with a big no harm, can only be better, if you can use a small, but a little longer charging time.
Q:Can the notebook's power adapter be mixed?
This is a 90W power adapter This is Acer's 65W power adapter Here need to explain: General in the power adapter only shows the output voltage and current, not marked wattage, need to calculate their own. The value obtained by multiplying the number of voltages and the number of currents is the wattage. More on notebooks Related topics: Notebook forums hope that the above information is helpful to you
Q:Notebook power adapter on how to look at power
then the same formula can be used to calculate: power (unit: W) = voltage (unit: V) × current (unit: A). For example: the power adapter only identifies the output voltage is 20V, the output current is 4.5A, then we set a formula to know the output power is 20 × 4.5 = 90W.
Q:Lenovo g450 laptop power adapter specifications is what?
Lenovo G450 power adapter Model: ADP-90RH B LENOVO P / N: 36001681 Input: 100-240V ~ 1.5A 50-60Hz Output: 19V $ 4.74
Q:Is the motor having a variable frequency motor and a variable voltage motor?
Have. 2, variable speed control; 3, electromagnetic speed; 4, variable speed control; 5, variable resistance speed control. Household fans are variable speed control. In addition, the DC motor can also use variable voltage to speed.
Q:11kw 6-pole motor can be used to adjust the inverter to 1800RPM?
First, the inverter is no problem, I used so much to meet your needs       But to see if your motor can run at high speed, or whether the load is small, the power to have a general amount of redundancy. 6-pole motor synchronous speed of 1000, to meet your use to be transferred between 2000 or 1900, that is to say the frequency converter output frequency to be transferred to 90 to 100HZ.       Constant torque load is no problem, but the fan torque load to be a small job.
Q:What is the principle and implementation of the inverter?
AC-DC is relatively simple We know that the diode has a one-way conductivity You can use this feature of the diode into a bridge So that the other end is always flowing into the other end is always out of the way it gets the voltage sinusoidal change of the DC If the need for smooth DC also need to be rectified Simple method is to connect a capacitor
Q:B2b frequency how to speed
can be seen from the formula: frequency f changes, the speed will follow the change. 2) When the motor connected to the public grid, you can use the inverter (2) When the motor is connected to a single motor, you can change the output frequency of the generator directly to change the output frequency of the generator. Change the frequency of the power supply to the motor to change the speed of the motor.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range