High Medium Voltage Drive 3KV 1000KW VFD

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Energy-saving Solutions for Enterprise
1、Program Overview
◆Saving energy achieves 10% -70%
◆The enterprises do not need to pay for expense of equipment manufacture and installation.
◆Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
◆According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)。
◆Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility。
2)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2、Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3、Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is the motor having a variable frequency motor and a variable voltage motor?
Have. 2, variable speed control; 3, electromagnetic speed; 4, variable speed control; 5, variable resistance speed control. Household fans are variable speed control. In addition, the DC motor can also use variable voltage to speed.
Q:East yuan 7200GS inverter start 11KW 4-pole motor and 2-pole motor need to modify what parameters?
motor to be slightly larger, the speed of 4 pole speed is 1450 r / min, 2 pole is 970 r / min The With the inverter control, you only need to modify the parameters of which the motor parameters, and then the motor parameters from the study on it, the most important is your use of inverter equipment and control methods, and then the above two factors Feature adjustment parameters. There is to pay attention to the use of the inverter environment, the inverter is an electronic product, the environment is relatively high, in the use of as much as possible to improve the use of the environment.
Q:What is the adapter?
Easy Alliance Electronics (China) Co., Ltd. (eNetwork) currently has a different series, different types of adapters, original authentic, and sold at competitive prices.
Q:Laptop power adapter current is not the same alternative?
The adapter is the voltage source, the actual output current depends on the size of the load resistance,
Q:Motor nameplate on the standard 2P, I set the number of motor pole in the inverter, is set 2 or 4 pole?
n the motor pole, an Antarctic (S pole), an Arctic (N pole), calculate a pair of poles, the number of pole pairs is how many such "pairs" (S pole + N pole). 2 pole motor --- pole pairs 1 = P = 1,4 pole motor --- pole pairs 2 = P = 2, and so on.
Q:How does the laptop's power adapter open
First put the power adapter on a clean desktop, with electric knife to the upper and lower cover along the edge of the gap slowly pry open, you can also use the hammer gently tapping the back of the electric knife, so you can turn on the laptop power adapter
Q:Siemens g120 inverter torque limit what is the meaning
Torque is a strain, the inverter can not actively control the output torque size, only according to the size of the load demand torque, the output of the corresponding torque.
Q:HP laptop power adapter how to open
HP notebook power adapter for the full size of the design, you can follow the following steps to dismantle: 1, notebook computer power adapter for the injection molding package or with a strong adhesive glue, without any screws, so generally only with violence to crack. However, as long as the method properly, after the dismantling of the power adapter can be restored to the original, do not carefully observe almost no traces of open. 2, the power adapter on the side of the side of the white paper, with an electric knife edge along the power adapter between the gap between the cover, and then hit the electric knife with a hammer, so that the electric knife from the adapter between the upper and lower cover go with. In the different positions of the gap between the upper and lower covers of the adapter, use the tip of the electric knife to be scratched along the gap. When the upper and lower covers are first split, the depth of the tool is deep and then the upper and lower covers of the adapter are separated. 3, then open the shell of the power adapter, you can see the adapter circuit outside the package with a copper shield, with a knife to cut the shielding tape on the tape, and then use the soldering iron shield and the internal circuit board connected to the two Solder joints, you can remove the shield. 4, between the shield and the circuit board is also separated by a layer of thick plastic film, and then cut off the knife after the United States, you can see the circuit board "Lushan true"
Q:The laptop's power adapter can be used on a desktop computer
Desktop machine is called DIY it ~ is the assembly machine inside the motherboard graphics card hard drive memory What is the need for power supply every power to have a different interface
Q:Laptop power adapter problem
Second, the transformer This thing is not standardized production, the result is that even if the parameters of the same, the transformer to get another of this may not be compatible with the use of the explosion with the use of the cup like the situation, so we generally Stressed the original transformer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range