High Density Polyester HDPE pp welding fiberglass pp/pet Geogrid for Roadbed Bridge

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
500 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

High tensile Strength Polyester Biaxial Geogrid

Polyester Biaxial Geogrid Introduction

High tensile Strength Polyester Biaxial Geogrid select high strength synthetic fiber as raw material, adopt warp knitting oriented structure, and no curving between latitude and longitude fiber, use high strength filament on the intersection point to from firm bonding point, and fully perform the mechanical property.

Polyester Biaxial Geogrid  Feature

Warp-knitting polyester geogrid has the characteristics such as high strength, high modulus, low elongation, anti-ageing, and anti-brittle, high tensile strength, high tear strength, strong bonding force with gravel and soil, and multiple pre-designed.

Polyester Biaxial Geogrid Application Range

  • Strengthening weak sub grades of high-grad roads and railways, and separating different foundation soil materials.

  • Used in riverbank, slope and earth-preserving wall.

  • Enhancing varieties of the foundation.

  • Used in airport runway.

Polyester Biaxial Geogrid Technical Parameter

 

HPET Bi-grid

 

Project/Size

PET 150-150

PET 200-200

PET 260-260

PET 300-300

PET 350-350

PET 400-400

PET 500-500

PET 600-600

PET 700-700

PET 800-800

PET 900-900

PET 1000-1000

Elongation rate %

≤13

≤13

≤13

≤13

≤13

≤13

≤13

≤13

≤13

≤13

≤13

≤13

Intensity (KN/m)

vertical

150

200

260

300

350

400

500

600

700

800

900

1000

Horizontal

150

200

260

300

350

400

500

600

700

800

900

1000

Grid size (mm)

25×25                     40×40                               50×50

Width (m)

1-6

1-6

1-6

1-6

1-6

1-6

1-6

1-6

1-6

1-6

1-6

1-6

Packaging & Delivery

Packaging Details:plastic pipe + black PE membrane
Delivery Detail:one 40HQ within 15 days after receipt of T/T or L/C at sight

 

 High Density Polyester HDPE pp welding fiberglass pp/pet Geogrid for Roadbed Bridge

High Density Polyester HDPE pp welding fiberglass pp/pet Geogrid for Roadbed Bridge

High Density Polyester HDPE pp welding fiberglass pp/pet Geogrid for Roadbed Bridge

High Density Polyester HDPE pp welding fiberglass pp/pet Geogrid for Roadbed Bridge


 

FAQ

1. How about the delivery time?   

    Lead time since receipt of 30% T/T deposit payment: 3 weeks.   

2. What kind of payments does jenor support?  

  T/T, L/C, Cash are accepted.

3. What's are the MOQ?  

    We can according to your condition to set the MOQ.

    And we can provide you samples for quality inspection. 

4. Do you charge for the samples?  

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee If you set the order . 

5. Can you produce the product according to customers' requirements ?   

    Sure, we are professional manufacturer, OEM and ODM are both welcome.

6. Can you tell me your main customers?   

    That's our customers' privacy, we should protect their information.   At the same time, please rest assured that your information is also safe here.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the geotechnical testing items for Subgrade?
Longitudinal and transverse tensile strength and elongation
Q:What is the lowest price of two-way Plastic Geogrid
The cheapest non-standard 15KN the cheapest price of 2.1 this is the factory with the tax price, the general amount of words, you can also be cheaper
Q:Characteristics of steel plastic geogrid
5, the use of high density polyethylene plastic composite grid can ensure that: at room temperature will not be affected by acid and alkali and salt solution, or oil erosion; will not be dissolved by water or microbial damage. At the same time, the high molecular weight of polyethylene is also sufficient to resist ultraviolet radiation caused by aging. The grille stress aspect rib synergistic effect, can not generate node crack or damage. But in the actual project, after the packing compaction, therefore has not been subjected to the ultraviolet light and the oxygen erosion, therefore completely may satisfy the permanent construction request.Engineering applications: highway, railway, bridge, road, pier, dam, slag field, such as soft soil foundation reinforcement, retaining wall and pavement crack resistance engineering and other fields.
Q:How to distinguish from the appearance of plastic geogrid and fiberglass geogrid
Appearance difference is obvious,
Q:Who knows the evaluation criteria and technical disclosure of Geogrid
3) fill: after the completion of the grille, should be timely (48 hours) filling. Each layer should be carried out according to the principle of "the first two sides, the middle of the back". The packing is not allowed to be unloaded directly on the geogrid. It must be unloaded on the soil surface which has been paved. The soil unloading height is not more than 1m. All vehicles and construction machinery shall not be allowed to walk directly on the paved geogrid, but only to be allowed to travel along the axis of the embankment.4) the upper and lower sides of the geogrid, and 8 cm from the grid layer shall not be more than 6 cm in diameter
Q:Construction technology of steel plastic grille
(4) the first layer of geogrid paved, began to fill with second layers of 0.2m in thick sand (coarse), the method of sand transport to the site: car unloading to the subgrade side, then put forward to push the bulldozer, within 2 meters on both sides of the subgrade filling after 0.1M, the first layer of geogrid fold up and then fill in 0.1 meters in the sand (coarse), from both sides to the middle filling and advance, prohibit all machinery without filling (coarse sand) of Geogrid on traffic operation, it can guarantee the geogrid is smooth, does not play drums, do not wrinkle, stay in the second layer (coarse) after the formation of sand, the level of measurement, to prevent uneven filling thickness, leveling and correct use of vibratory roller 25T static pressure two times.(5) as the second layer of geogrid layer construction method with the first method, and finally filling in 0.3m (coarse sand), filling in the same way as the first layer, using 25T hydrostatic roller two times, so subgrade reinforcement is dealt with.
Q:Overview of fiberglass grille
The product is made of high strength alkali free glass fiber through international advanced warp knitting process made of mesh substrate, the surface coating processing made of semi-rigid products.
Q:What are the specifications of the geogrid
Geogrid is divided into plastic geogrid
Q:One-way plastic geogrid TGDG120 how qualified
One way plastic geogrid is mainly used in Subgrade Reinforcement Engineering
Q:What kind of projects are used to detect the geogrid
Geogrid conventional testing includes

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range