High Carbon Steel Spring Wire for Flexible Duct

Ref Price:
$1,000.00 / m.t.
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
5 m.t.
Supply Capability:
10000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

1. high carbon spring wire
2. Wire dia:0.4-13mm

3 .Standard:DIN17223 GB4357-89

4 .Delivery time:15 days 1*20FCL

5 .MOQ:1 Ton

1. Specification

Material

45#,60#, 65#, 65Mn, 70#, 72A, 72B, 80#, 82B,SAE1060, SAE1065, SAE1070

Dia

0.3-13.0mm

Surface

Smooth, phosphated and lead patent heat treatment

Quality inspection of each coil

Tensile Strength, Tolerance, Surface smooth, Torsion,Bending,Winding, Ellipse , etc.

Certificate

ISO9001,ISO14001,SGS,Jiangsu Famous Brand , Excellent Quality Metallurgical Products

Standard

DIN17223/1-1982,GB4357-89 and other standards .

Application

making springs, steel ropes, cable wires, mattress ,banding wire

Coil weight

15KG-200KG per coil or as per your requirement

Packaging

coils, packed with P.P.cloth or according to customers' request.

Dilivery time

15 days for one 20 feet container.

Loading Capacity

Loading about 20tons in one 20's containe

Tensile Strength

High Carbon Steel Wire

wire diameter(mm)

Tensile Strength(N/mm² )

Grade B

Grade C

Grade D

0.20

2150-2550

2400-2790

2690-3090

0.25

2060-2450

2300-2700

2640-3040

0.30

2010-2400

2300-2700

2640-3040

0.40

1910-2300

2250-2650

2600-2990

0.50

1860-2260

2200-2600

2550-2940

0.60

1760-2160

2110-2550

2450-2840

0.70

1710-2110

2060-2450

2450-2840

0.80

1710-2060

2010-2400

2400-2840

1.00

1600-2010

1960-2300

2300-2690

1.20

1620-1910

1910-2250

2250-2550

1.40

1620-1910

1860-2110

2150-2450

1.60

1570-1860

1810-2160

2110-2400

1.80

1520-1810

1760-2110

2010-2300

2.00

1470-1760

1710-2010

1910-2200

2.20

1420-1710

1660-1960

1810-2110

3.00

1370-1670

1570-1860

1710-1960

4.00

1320-1570

1520-1760

1620-1860

5.00

1320-1570

1470-1710

1570-1810

6.00

1220-1470

1420-1660

1520-1760

7.00

1170-1420

1370-1570

8.00

1170-1420

1370-1570

9.00

1130-1320

1320-1520

10.00

1130-1320

1320-1520

11.00

1080-1270

1270-1470

12.00

1080-1270

1270-1470

13.00

1030-1220

1220-1420

 *Chemical Composition

Steel Grade

GB Standard

Carbon

%

Silicon

%

Manganese

%

Phosphorus

%

Sulphur

%

Chromium

%

Nickel

%

Cuprum

%

60#

0.60-0.61

0.18-0.22

0.52-0.59

0.012

0.007

0.06-0.07

0.05

0.18

65#

0.65

0.21

0.56

0.013

0.008

0.05

0.04

0.14

65Mn

0.60-0.70

0.10-0.25

0.70-1.00

0.030

0.030

0.20

0.20

0.25

70#

0.69-0.71

0.19-0.21

0.53-0.58

0.010-0.012

0.003-0.006

0.01-0.05

0.02-0.04

0.04

72A 72B

0.72

0.19

0.71

0.013

0.006

0.02

0.02

0.03

80#

0.80-0.81

0.22-0.24

0.59-0.76

0.008

0.004

0.04

82A 82B

0.82

0.24-0.25

0.76-0.77

0.011-0.014

0.004-0.007

0.17-0.17

2. Packing

Small coil or large coil for the steel wire : Coils, packed with P.P.cloth or according to customers' request

Z2 packing :200-350KF per coil

Iron spool or wood spool for the steel wire

3. Our service

Sample order: we supply you free sample, you pay for the express cost, which  can be shipped in 3 days

Our promise: Send you a workable price ;

Delivery in time;

Service you in lifetime for free;

Full refund if substandard goods

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
Usually in accordance with cubic meters or kilograms to calculate the price
Q:Flexible pipe trench backfill inspection batch quality acceptance record how to fill
Go to the site to run you may have a harvest; The The The The
Q:Will the embedded stove why use stainless steel corrugated hose connection?
The construction of the scaffolding of this project is subject to the requirements of the relevant sections of the latest JGJ130-2011 "Safety Code for Construction Fastener Steel Scaffolding" To design and calculation, the preparation of special safety construction program, after the implementation of the approval. The preparation of the steel pipe should be selected first vertical and horizontal spacing and horizontal bar step, only these are determined in order to calculate the amount of steel pipe.
Q:How to optimize the construction management to improve the quality of construction projects
I suggest you look at Google, there will be a lot, I hope you can find a satisfactory, I wish you a happy life!
Q:What is the difference between a rigid sleeve and a flexible sleeve?
The usual insulation materials are associated with the insulation, the choice of insulation materials are usually smaller than the heat, that is not due to changes in the external temperature and dramatic changes in thermal performance can be stable as ever, therefore, the current building commonly used Of the insulation materials to heat insulation mortar and thermal insulation performance classes gnawing rescue to find the majority of silent board, in these two aspects of doing better is the dragon EVB series.
Q:What is the effect of concrete pouring on the construction quality?
The use of the trench connection to check the pipe sealing surface is smooth, smooth, no burr. Whether the sealing surface of the sealing ring is scratched, whether the length of the sealing section of the pipe meets the requirements. These three points to ensure that certainly not leaking.
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q:Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
Air conditioner is the air temperature, humidity, purity, air speed, for processing, to meet people's production and living needs of the equipment, referred to as air conditioning
Q:Talk about the class flexible management of the class teacher what the requirements
National Standard B Administrative Regulation C Industry Code D Normative document Local regulations which of the following are safety technical standards? (ACDE) A Code for safety of construction work JGJ80-91B Construction Engineering Supervision Standard Safety code for construction machinery use JGJ33-2001D Standard for Safety Inspection of Building Construction JGJ59-2011E Tower crane safety regulations GB5144- from the 90's onwards, the Ministry of Construction have prepared a number of building safety technology standards, including (ACDE) A Building construction safety inspection standard B Measures for the Administration of Construction Permit for Construction Works Technical Specification for Safety of Fastener Steel Scaffolding for Building Construction Gantry and derrick material hoist safety technical specifications "the State Council on the further strengthening of production safety decision" (Guo Fa [2004] No 2) pointed out: to strive to build (ABCDE) of the safe production work pattern A Government united leadership Department of supervision according to law The enterprise is fully responsible for D Mass participation in supervision The whole society is widely supported according to the Ministry of Construction on the construction enterprises and the safety of production and management of the main responsibilities of the production of the following responsibilities (ABCD) A Implement national laws and regulations on safe production and standard B Prepare and timely update the safety management system Organize the full safety education Organize security checks Organize the preparation of special construction program
Q:Do you have a natural gas hose in the flue?
Look at where, install and dismantle about a total of 50 yuan a square it The activities of the activities of the Central Chamber of Commerce Co

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range