HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--008

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How is the real estate industry like?
real estate intermediary services, including real estate consulting, valuation and brokerage agents, property management.
Q:How is China's housing market trend ?
  Under the supervision of the pressure of competition and the supervision of the government
Q:How can we do real estate?
So to become a top sales staff, we must first learn how to maintain a positive attitude
Q:What is the relationship between interest rates and the real estate market?
Real estate prices are concentrated in the performance of the real estate market, most of the main funds for real estate development comes from bank loan
Q:How is the real estate sales invoice open?
Through the real estate tax control system to issue real estate invoices, including the advance payment
Q:Real estate business, when to carry forward the cost?
How to distribute profits. The real estate costs carry forward, because it involves real estate sales contracts, subscription agreements, sales lists, construction contracts
Q:Kentucky is selling real estate how to understand?
because he knows the property and location will be the success of each branch of the most important Factor
Q:What is the land deed tax rate for real estate?
donation and exchange, housing sale, house donation and house exchange need to pay deed tax; In the current, real estate enterprises to pay land tax is 3%.
Q:Determine what long-term factors in our housing market?
From the long-term factors that determine the housing market in China
Q:What are the aspects of the risk of real estate investment and development?
long construction period, the impact of factors such as diversity, making real estate development and investment activities are facing many risks

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range