HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--007

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the specific real estate stocks
Real estate shares refers to the listed companies, real estate projects for the company's main business stocks
Q:What is the land deed tax rate for real estate?
donation and exchange, housing sale, house donation and house exchange need to pay deed tax; In the current, real estate enterprises to pay land tax is 3%.
Q:What is the characteristics of real estate?
Each type of auction subject has its own particularity, this particularity is associated with the characteristics of the subject matter, the real estate has the following characteristics:
Q:How is the real estate sales invoice open?
the first payment, the mortgage to open the invoice, pay the time to open the invoice
Q:What is the characteristics of real estate prices
real estate prices, including the following six points,Real estate prices have obvious price characteristics
Q:How is China's housing market in other aspects of the trend ?
the further maturity of the national macro - control and the increase of the rationality of the purchasers
Q:What is the meaning of real estate?
Real estate is the general term for real estate and property, including permanent buildings on land and land and the rights derived therefrom
Q:Real estate in the "five card" which five?
transfer of land before the city planning and administrative departments to confirm the location and scope of construction projects in line with the city planning legal certificate;
Q:When is the introduction of real estate?
In the early stages of the beginning of the eighties, the first control is in 93 years
Q:Real estate business, when to carry forward the cost?
For real estate companies, carry forward costs is its most important step. Only carry forward the cost, in order to know how much real estate projects to achieve income, and how much profit

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range