HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How is the real estate sales invoice open?
the first payment, the mortgage to open the invoice, pay the time to open the invoice
Q:China's real estate market began to develop rapidly is what year
From 1978 to 1991, the theoretical breakthrough and the initial stage, the formulation and implementation of land law and planning law, provided the legal basis for the development of real estate.
Q:What is the trend of real estate now?
First, real estate is China's pillar industries, the Government does not allow house prices collapse.
Q:What is the real estate bubble economy?
in fact, The use of assets and its profitability is not interested in. With the rise in prices, often the expected reversal and the price of the crash, which usually leads to financial crisis
Q:Real estate, people often say 'case' is what it means
Is the meaning of the scene, also known as the sales case, refers to the sales office site.
Q:What is the impact of the economic environment on real estate?
The sales of the houses depend on the purchasing power of the consumers
Q:What are the specific real estate stocks
Real estate stocks have been one of the hottest groups in China's stock market. As early as 1990-1994
Q:What is the difference between land valuation and real estate valuation?
taking full account of socio-economic development, land use, land expected benefits and land use policies and other factors on the impact of land revenue
Q:According to the use of housing classification?
According to the use of housing functions can be divided into eight categories:
Q:What are the categories of real estate?
According to the "urban land classification and planning and construction land standards", urban land can be divided into nine categories:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range