• HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018 System 1
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018 System 2
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018 System 3
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018 System 4
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018 System 5
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018

HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
50000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Q:What is the real estate level market secondary market three market
The transfer of land, can be a habitat, it can be developed through the "seven links and one leveling" of the cooked land
Q:Determine what long-term factors in our housing market?
First, the population factor. That is, with the increase in population, the demand for housing will increase
Q:What does real estate mean?
Real estate can have three forms of existence: the land, buildings, real estate one. In the real estate auction, the auction of the subject can also have three forms of existence
Q:What is the relationship between interest rates and the real estate market?
the level of interest rates directly affect the cost of real estate development and profits
Q:What conditions should a real estate agent have?
Pressure capacity. Putting your own position, correct attitude, face the pressure, bear the challenge is every real estate agent
Q:What is the real estate from the law?
that is, land (or land use rights), buildings and premises in a state of physical entities and their rights and interests.
Q:According to the use of housing classification?
1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
Q:What is the impact of the economic environment on real estate?
From the demand and transactions, it is expected that some of the second-tier cities in 2010 is expected to rise in house prices and the impact of insufficient supply will decline
Q:China's real estate market began to develop rapidly is what year
From 1978 to 1991, the theoretical breakthrough and the initial stage, the formulation and implementation of land law and planning law, provided the legal basis for the development of real estate.
Q:Kentucky is selling real estate how to understand?
because he knows the property and location will be the success of each branch of the most important Factor

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products