HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q:What is the real estate level market secondary market three market
- The transfer of land, can be a habitat, it can be developed through the "seven links and one leveling" of the cooked land
- Q:Determine what long-term factors in our housing market?
- First, the population factor. That is, with the increase in population, the demand for housing will increase
- Q:What does real estate mean?
- Real estate can have three forms of existence: the land, buildings, real estate one. In the real estate auction, the auction of the subject can also have three forms of existence
- Q:What is the relationship between interest rates and the real estate market?
- the level of interest rates directly affect the cost of real estate development and profits
- Q:What conditions should a real estate agent have?
- Pressure capacity. Putting your own position, correct attitude, face the pressure, bear the challenge is every real estate agent
- Q:What is the real estate from the law?
- that is, land (or land use rights), buildings and premises in a state of physical entities and their rights and interests.
- Q:According to the use of housing classification?
- 1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
- Q:What is the impact of the economic environment on real estate?
- From the demand and transactions, it is expected that some of the second-tier cities in 2010 is expected to rise in house prices and the impact of insufficient supply will decline
- Q:China's real estate market began to develop rapidly is what year
- From 1978 to 1991, the theoretical breakthrough and the initial stage, the formulation and implementation of land law and planning law, provided the legal basis for the development of real estate.
- Q:Kentucky is selling real estate how to understand?
- because he knows the property and location will be the success of each branch of the most important Factor
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 018
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products