HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 015

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to classify real estate?
According to the different needs, can be from different angles on the real estate market classification
Q:What kind of factors in our housing market?
China's 20th century, 80,90 baby boom in the beginning of this century began to work
Q:China's real estate market began to develop rapidly is what year
From 1978 to 1991, the theoretical breakthrough and the initial stage, the formulation and implementation of land law and planning law, provided the legal basis for the development of real estate.
Q:Real estate, people often say 'case' is what it means
Such as the case of sales salesman is known as the new sales of commercial housing sales office or sales lady.
Q:What are the specific real estate stocks
Real estate shares refers to the listed companies, real estate projects for the company's main business stocks
Q:What is the difference between a real estate model and a real estate sand table?
as well as the project itself, the regional location information and functional division and so on. Is an indispensable sales of home sales props.
Q:According to the use of housing classification?
1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
Q:What is the real estate level market secondary market three market
The transfer of land, can be a habitat, it can be developed through the "seven links and one leveling" of the cooked land
Q:What is the red line in the real estate project?
The "red line" is the range boundary line.Road red line is the road boundary line (including green belt, pedestrian walkway)
Q:Real estate in the "five card" which five?
transfer of land before the city planning and administrative departments to confirm the location and scope of construction projects in line with the city planning legal certificate;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range