HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 014

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the real estate level market secondary market three market
The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
Q:What is the real estate industry?
the transfer of state-owned land use rights, real estate development and redevelopment, such as the acquisition of land, demolition resettlement
Q:What is the characteristics of real estate prices
According to "China real estate valuation industry development prospects and investment strategy planning analysis report" statistical analysis
Q:How is China's housing market trend ?
the behavior of real estate development companies will gradually regulate the various intermediary organizations will gradually develop
Q:According to the use of housing classification?
5, hotels 6, sports and entertainment facilities 7, government and public facilities 8, multi-purpose buildings (integrated buildings).
Q:What is the real estate development prospects now?
Although the short term, the real estate market because the price is too high lead to lack of effective demand
Q:Real estate, people often say 'case' is what it means
Such as the case of sales salesman is known as the new sales of commercial housing sales office or sales lady.
Q:How is the real estate industry like?
the real estate regulation and management, that is, the establishment of real estate capital market, technology market, labor market
Q:Real estate in the "five card" which five?
Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
Q:What is the main property sales?
new homes and old houses, commercial housing, fund - raising room to do, the scope to be bigger, a region of all houses have the opportunity to do

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range