HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 009

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to classify real estate?
According to the different needs, can be from different angles on the real estate market classification
Q:How is China's housing market in other aspects of the trend ?
the future price of the housing market in our country will gradually become reasonable and the house price income will be higher than that of entering into a maintainable space.
Q:How is the real estate sales invoice open?
Through the real estate tax control system to issue real estate invoices, including the advance payment
Q:China's real estate market began to develop rapidly is what year
China's real estate boom and rapid development began in 1998, the housing system monetization reform.
Q:When China introduct the real estate?
from the beginning of 99 the real estate market into a new stage of market-oriented.
Q:What is the relationship between interest rates and the real estate market?
And interest rate changes as an external factor, is bound to invest a huge investment in real estate a great impact,
Q:What is the real estate level market secondary market three market
that is, the state through its designated government departments will be urban state-owned land or rural collective land requisition for state-owned land to sell to the user's market
Q:What is the red line in the real estate project?
Real estate often said that the "red line" is the land for its development and use of the land range (land acquisition within the scope of the land, such as green space, planning road land)
Q:Real estate in the "five card" which five?
Construction project planning permit" is the construction project in line with the requirements of urban planning legal evidence;
Q:How is China's housing market trend ?
the behavior of real estate development companies will gradually regulate the various intermediary organizations will gradually develop

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range