• HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 008 System 1
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 008 System 2
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 008 System 3
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 008 System 4
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 008 System 5
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 008

HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 008

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Q:Real estate business, when to carry forward the cost?
For real estate companies, carry forward costs is its most important step. Only carry forward the cost, in order to know how much real estate projects to achieve income, and how much profit
Q:What is the trend of real estate now?
China's housing market has entered the adjustment period, but will not collapse. The reason is as follows
Q:What is the meaning of the term in the real estate?
Intermediary companies should visit the owners on a regular basis to understand the situation of the owners. This is called dishwashing
Q:What is the gross margin of the real estate industry?
Real estate development profits generally 20% -40%, how much less, mainly to see how to control costs
Q:When is the introduction of real estate?
In the early stages of the beginning of the eighties, the first control is in 93 years
Q:How is China's housing market in other aspects of the trend ?
??With the continuous squeeze of the bubble, the strengthening of the industry competition
Q:Real estate in the "five card" which five?
transfer of land before the city planning and administrative departments to confirm the location and scope of construction projects in line with the city planning legal certificate;
Q:China's real estate market began to develop rapidly is what year
1991 to 1995 irrational speculation and adjustment stage, Deng Xiaoping Southern speculation after the southern real estate speculation prevailed, the final hard landing, real estate into a downturn
Q:The future of real estate?
nterest rate plus reserve ratio, the country eight, the purchase order, 10 million resettlement room hard targets
Q:How is the real estate sales invoice open?
The paper format of the invoice is the same, but the distinction between pre-payment and settlement of the two cases

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products