HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 007

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What conditions should a real estate agent have?
past happy things, friends and family expectations
Q:What are the real estate management professions?
the professional training of moral, intellectual, physical and aesthetic development
Q:What is the characteristics of real estate prices
Because the real estate itself is fixed and immutable, unlike other commodities through the sale can be transferred to any place to use
Q:What is the real estate bubble economy?
in fact, The use of assets and its profitability is not interested in. With the rise in prices, often the expected reversal and the price of the crash, which usually leads to financial crisis
Q:When China introduct the real estate?
Then the market to further recovery and development, 97,98 years when they met the Asian financial crisis
Q:What is the real estate from the law?
Real estate because of its own characteristics that the location of the fixed and immutable, in economics, also known as real estate.
Q:What is the difference between land valuation and real estate valuation?
Land valuation is based on the principles, theories and methods of land valuation
Q:What is the real estate level market secondary market three market
The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
Q:What does real estate mean?
Real estate refers to the land, buildings and fixed in the land, the building can not be separated from the part and its accompanying benefits.
Q:How is China's housing market trend ?
  Under the supervision of the pressure of competition and the supervision of the government

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range