HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of factors in our housing market?
they will release a huge purchasing power and demand, thereby stimulating the development of China's real estate
Q:What is the trend of real estate now?
First, real estate is China's pillar industries, the Government does not allow house prices collapse.
Q:What is the land deed tax rate for real estate?
the transfer of state-owned land use right, the transfer of land use rights, including the sale
Q:What is the relationship between interest rates and the real estate market?
And interest rate changes as an external factor, is bound to invest a huge investment in real estate a great impact,
Q:How is China's housing market in other aspects ?
First, the proportion of high-end residential will decline, the proportion of affordable housing and low-rent housing will rise
Q:What is the meaning of the term in the real estate?
but there are many houses are not immediately sold for a long time, the accumulation of the house is also more
Q:The future of real estate?
nterest rate plus reserve ratio, the country eight, the purchase order, 10 million resettlement room hard targets
Q:What is the red line in the real estate project?
The "red line" is the range boundary line.Road red line is the road boundary line (including green belt, pedestrian walkway)
Q:Real estate in the "five card" which five?
State-owned land use permit is to prove that the land user to pay the land use right transfer fee, access to a certain period of time within a state-owned land use rights legal certificate;
Q:What is the real estate development prospects now?
Although the short term, the real estate market because the price is too high lead to lack of effective demand

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range