HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 003

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the real estate industry?
commissioned planning and design, organizational development and construction of the old city land redevelopment;
Q:When is the introduction of real estate?
China 's real estate market is introduced from the eighties
Q:Kentucky is selling real estate how to understand?
KFC's long-term business plan, the basic business will be the sale of KFC's various branches to the various partners
Q:When China introduct the real estate?
mainly in China's southern, Hainan, Shenzhen, Zhuhai, Huizhou, Beihai city appeared in the real estate market overheating problem
Q:What are the specific real estate stocks
Real estate stocks have been one of the hottest groups in China's stock market. As early as 1990-1994
Q:What is the difference between a real estate model and a real estate sand table?
The model is usually a single, single, or an independent type. From the external decoration to the internal use of functions
Q:What is the relationship between interest rates and the real estate market?
And interest rate changes as an external factor, is bound to invest a huge investment in real estate a great impact,
Q:What is the main property sales?
Single-handedly for a real estate such sales, the scope is not very wide, often finished a real estate will be assigned to another real estate
Q:Real estate in the "five card" which five?
Construction permit; "commercial housing pre - sale permit".
Q:What are the aspects of the risk of real estate investment and development?
Real estate investment development is a dynamic process, both the benefits and risks exist. As the real estate has the location of the fixed and immutable, large investment

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range