HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 002

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the land deed tax rate for real estate?
the transfer of state-owned land use right, the transfer of land use rights, including the sale
Q:What are the categories of real estate?
According to the "urban land classification and planning and construction land standards", urban land can be divided into nine categories:
Q:What is the real estate bubble economy?
an asset Or a series of asset prices in a continuous process of the sharp rise in the initial price increases so that people will be expected to further rise in prices
Q:What is the meaning of the term in the real estate?
but there are many houses are not immediately sold for a long time, the accumulation of the house is also more
Q:What is the status quo of China's real estate market?
from 20 years of real estate development process, the real estate industry has gradually entered a standardized and institutionalized road
Q:According to the use of housing classification?
5, hotels 6, sports and entertainment facilities 7, government and public facilities 8, multi-purpose buildings (integrated buildings).
Q:What is the meaning of real estate?
The real estate standard simply said that the benchmark land price, refers to a homogeneous area of the same purpose of land the average price of land
Q:How is the real estate industry like?
real estate business, including the transfer of land use rights, rental, mortgage and housing transactions leasing, mortgage and other activities
Q:Real estate in the "five card" which five?
Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
Q:When is the introduction of real estate?
China 's real estate market is introduced from the eighties

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range