HDPE Pond Liner Geomembrane Manufacturer

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
2000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Geomembrane Introduction:

 

HDPE Geomembrane liner are made from polyethylene polymer materials that blow molding,its main function is to prevent the liquid leakage and gas volatile.According to the production of raw materials can divide into HDPE geomembrane liner and EVA geomembrane liner,etc.

 

Geomembrane  Specification:

Thickness

0.12mm-4.0mm

Length

50m/roll,100m/roll,150m/roll or as your   choice

Width

5.0m-7.0m or as your choice

Color

White/Black/Blue/Green,mainly black

Material

HDPE

Delivery port

Qingdao

Package:

woven bag or as customers' requests

Product time

2-20 days

Features

1.Good physical and mechanic performance

2.High tearing resistance, strong   deformation adaptability

3.Puncture-resisting, aging resisting,   ultra-violet radiation, oil and salt, and corrosion resistance

4.Good adaptability to high and low   temperature, non-toxicity, long service life

5.Good waterproof, drainage, anti-seepage   and damp proof effects

6.Complete width and thickness   specifications, low cost and easy installation.

Note

We can do as your demand,please feel free to contact us for more information

 

Geomembrane Usage:

 

1.landfill,sewage or control the waste residue seashores seepage.

 

2.Lake dam,tailings dams,sewage dam and reservoir,channel,storage of liquid pools(pit,ore)

 

3.The subway ,tunnel,anti-seepage lining of basement and tunnel.

 

4.To control the roadbed and other foundation saline seepage.

 

5.Dike,the front of the sam foundation seepage prevention bedding,level of vertical impervious layer , construction cofferdam,waste field.

 

6.Seawater,freshwater fish farms.

 

7.Highway,the foundations of the highway and railway;the expansive soil and collapsible loess of the waterproof layer.

 

8.Anti-seepage of roofing

 

HDPE geomembrane liner technical of ASTM test GM 13 standard:

No.

Item

Test Value

0.75mm

1.0 mm

1.25 mm

1.5 mm

1.8mm

2.0mm

2.5 mm

3.0mm

1

Minimum Density(g/cm³)

0.94

2

Strength at yield,N/mm

11

15

18

23

27

30

38

45

3

Strength at break ,N/mm

21

28

33

43

51

57

71

85

4

Elongation at yield,%

13

5

Elongation at break,%

700min

6

Tear Resistance N

93

125

156

187

219

249

311

373

7

Puncture Resistance N

263

352

440

530

618

703

881

1059

8

Stress Crack Resistance, hrs

400

9

Carbon Black Content, %

2.0-3.0

Carbon Black Dispersion

1 or 2

10

Standard OTI Min

100

High Pressure OTI Min

400

11

Impact Cold Crack at -70°C

Pass

12

Water vapor permeability

(gNaN/cm2 .s.Pa)

≤1.0×10-13

13

Dimensional Stability (%)

±2

  

FAQ:


- Q1: Can you provide a sample for us?   

  A:Yes,We can send free samples,but customer need to pay the freight.

 HDPE Geomembrane Price


- Q2: What is your minimum order quantity?

   A:The minimum order quantity is 5000 ,but it is negotiable.

 HDPE Geomembrane Price


- Q3:What is your payment terms?

  A: T/T,Western Union,Paypal,L/C...

 HDPE Geomembrane Price


- Q4:What is your delivery time?

   A:Production time usually costs 2-20 days.  


Gemembrane Show:

 

geomembrane

geomembrane

geomembrane

geomembrane

geomembrane

geomembrane

geomembrane


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the application of composite waterproofing geomembrane?
Composite waterproof membrane is a kind of two component waterproof paint made of organic liquid, various addictives, inorganic powder (made of high alumina cement or iron Portland cement white quartz powder and various additives), is a kind of waterproof material with high elastic organic material and good durability of inorganic materials, it will form tough waterproof coating, and can be coated with color coating according to the project needs.
Q:Is the effect of protective film for computer monitor good?
The computer monitor protective film takes electrostatic adsorption capacity as viscous force, which is a kind of protective film completely without glue, andof course its viscidity is relatively weak, mainly used for surface protection like electroplating Netted film is a kind of protective film with many grids on the surface, which has good air permeability and good pasting effect, unlike plain film which will leave bubbles.
Q:What functions does moistureproof membranes have?
Moistureproof membranes use high-pressure polyethylene materials. After butane physical foaming, they are non-toxic and harmless without any dross and reused materials which can be used between floor and mats. They can protect floor, adjust the flatness of floor, and are moisture- and soundproof. The height of skirting board is generally 8 cm.
Q:What are the features of the protective film of floor in decoration?
1, protection film for floor is a protective material used in the decoration industry which can protect the floor, walls, staircase and elevator rooms. It can be used to protect finished products in home decoration and the interior decoration of villa hotel. Company name, phone number and corporate identity of the decoration corporation can be printed on the protective film to promote the company. 2, the finishing protective film can be divided into three types. The first one is PE foam type. It is light and easy to operate, but it is also easy to be damaged, thus can not play the role of protection.
Q:How to install and use geomembrane impervious instrument?
Q:How to put up membrane on the laptop?
Membrane pasting steps: 1. Align the membrane surface marked 1 with the screen, pull its release liner label and peel off part of it slowly. Please note that don't let your fingers touch the adsorbed layer (interlayer) of the protective film. 2. Aligh the adsorbed layer with the four corners of the screen and ensure the alignment. While peeling off the release liner of the backing layer marked 1, smooth it carefully. For the protective film now has automatic electrostatic adsorption function, generally it does not require much smoothing. When putting up membrane, you should be slow in motion. It is suggested that you should start pasting from the long side of the screen, from points to lines, and from lines to dimension in sequence.
Q:what's the distinguish between geomembrane and waterproof board?
Basements and tunnels; tailing dam, rockfill dam; waste storage; construction cofferdam; m2-800g & # 47; channels: Membrane thickness from 0: anti-seepage, isolation purposes, waste water reservoir dam and reservoir area, tunnel anti-seepage lining: Geotechnical dam, highway: 4-6-meter: Two cloth one membrane (both sides of the impermeable membrane are added with protective geotextile) one cloth one membrane (one side of impermeable membrane is added with protective geotextile) width, railroad embankment .8mm protective layer of geotextile from 100g & # 47.2mm - 0; roadbed and other foundation saline control, masonry dam and concrete dam development pressure; leakproof roofing product features; roads, Khouang); dike, reservoir tank (pit; underground; expansive soil and collapsible loess waterproof layer, dam levels impervious blanket, ground vertical impermeable layer
Q:How about Android cell phones not installing screen protector?
The key is that present phone screens are anti-scratch, not like the previous ones which are easy to be damaged after long term use. The screen protectors nowadays are mainly for falling prevention such as tempered film.
Q:What is calculation method of constructional column concrete project quantity ?
project quantity of external wall strip foundation =length of center line of external wall strip foundation × sectional area of ​​strip foundation. project quantity of interior wall strip foundation = length of clear line of interior wall strip foundation × sectional area of ​​strip foundation. note: Calculation of clear line① calculate brick strip foundation according to interior wall clear line. Calculation of constructional column project quantity ① constructional column volume = constructional column volume + stubble template. area of stubble template = length of stubble into wall (0.03) * height of constructional column ⑵, difficulties in calculation of constructional column project quantity ①, It is difficult to calculate the stubble of constructional column and you must consider how many walls the pillars cross with. ②, It is also difficult to calculate the template volume.
Q:how long does the film curing.
At least for a day.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range