Hammer Head Tower Crane with Good Quality

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane: 

The 2015 hot sales tower crane tc4808 features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.

 

The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjusted(m) 

38/43/48

Min working range(m) 

2.25

Max lifting capacity(t)

4

Tip load @ 48m(t)

0.8

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1

2

2

2

4

4

Speed(m/min)

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speed(m/min)

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speed(m/min)

0.4

Counterweight(t)

7.6

Mast section size(L×W×H)m

1.4×1.4×2m

Working temperature

-40-+60°C

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

380V                   65A

 

TC4808 with CE ISO certificate top kit 4T types of tower crane price for sale

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the insulation resistance of tower crane?
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q:More than meters of tower cranes must be equipped with red barrier lights at the top
To see the land of tower crane or floating crane... Basically,
Q:Who invented the tower crane, please?
Tower crane originated in Western europe. The first patent on tower cranes for construction was issued in 1900. In 1905, a crane with a boom was fixed in the tower.
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
According to the regulations of JGJ196-2010 for the safety and safety of installation, use and disassembly of tower cranes for construction purposes:The use of 4.0.15 tower crane height of more than 30m should be equipped with obstacle lights, jib root hinge height of more than 50m should be equipped with anemometer.
Q:What tower cranes are used on the 30 storey house?
The 30 storey building on the height of about 100 meters to 120 meters, plus 2 to 3 layers of basement, the tower crane must set the height of 110 meters to 140 meters, if the single building is less than 60 thousand square meters of building square meters, as the total number of square meters, using a two QTZ63 type tower crane is enough,
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:What are the safety devices in a tower crane?
(1) lift height limit position limiterFor cranes with variable boom angles, the lifting motion must be stopped immediately when the top of the lifting device rises to the 8OOmm at the lower end of the boom.For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately.(2) lifting moment limiter and maximum lift limiter;When the lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped.If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value.When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.(3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.(6) lightning protection and anti electromagnetic wave induction device;For the crane whose hinge height is over 50m, the lightning arrester shall be installed according to the actual situation and the electromagnetic interference shall be taken.(7) tower crane shall install limit torque coupling in order to prevent slewing overload.
Q:What is a TQ80 tower crane?
To put it simply, QTZ is updated than the TQ model, and the TQ series first appeared in 70s, and the QTZ series came out in the 80,90. Various parameters must be more advanced than TQ.
Q:What are the qualifications for site installation and acceptance of tower cranes and construction lifts?
These do not worry about you, these large machinery is a professional installation team, security, demolition,
Q:What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range