H-Frame Scaffolding with Painting from China

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg/m²
Supply Capability:
10000 kg/m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of H Frame ScaffoldingDescription 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

 

Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:

after deposit 10-15 days

 

2. Main Features of Frame Scaffolding

1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2)A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4) Frame system scaffolding  is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .

5) Frame system scaffolding   can be used for the building decoration which is the light duty scaffolding, it is more easier for moving.

6) Frame system scaffolding are dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness

3.Frame Scaffolding product pictures:

  H-Frame Scaffolding with Painting from China

 4.Frame Scaffolding Product Description

H-Frame Scaffolding with Painting from China

 

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Industrial / scaffold piercings - pierced with rings?
Scaffold Piercing Jewellery
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:people who have an industrial/scaffolding piercing?!?
I okorder.com for barbells. They have some pretty epic lightnight bolt ones and zigzags and they are like 3 bucks!!!! You can never find them in the mall like that :P lol. Anyway, i deff. think you should get the piercing. It's worth the pain. It'll be over in 2 seconds lol. Good luck :D
Q:How to calculate the rental price of portal scaffolding
According to the daily calculationSeparate accessories, such as pulleys, pedals, base, three foot and so on
Q:how much does a scaffold peircing hurt compaired to a nose piercing?
ive just had scaffolding done, and it was quite painful, far more painful than i was told. they just stab through your ear with a needle, but i didn't think it was that bad. not as bad as getting your nose done. but it was very sore and painful to touch for days after. hope this helps :) X
Q:Scaffolding????
Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
Q:Scaffolding/industrial piercing?
I got my lobes pierced 5 years before my industrial so I can't compare the pain but everyone says industrial. Idk if they can freeze or not. The pain is completely tolerable.
Q:What are the full house scaffolding specification
Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:Industrial Scaffold HELP!?
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range