H-Frame Scaffolding System for Construction

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1000 kg/m²
Supply Capability:
10000 kg/m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of H Frame ScaffoldingDescription 

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.


Packaging & Delivery

Packaging Detail:

Frame system scaffolding package in the container, or according to your requested

Delivery Detail:

after deposit 10-15 days


2. Main Features of Frame Scaffolding

1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2)A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4) Frame system scaffolding  is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .

5) Frame system scaffolding   can be used for the building decoration which is the light duty scaffolding, it is more easier for moving.

6) Frame system scaffolding are dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness

3.Frame Scaffolding product pictures:

  H-Frame Scaffolding System for Construction

 4.Frame Scaffolding Product Description

H-Frame Scaffolding System for Construction



 We have organized several common questions for our clients,may help you sincerely:

1)Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the components of a mobile scaffolding
The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:Exterior wall scaffold construction plan?
Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
Q:Specific specification for erection of civil scaffold
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
Q:The basic form of external scaffolding
The bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The bowl buckle joint is the core component of the scaffold system, which consists of the upper bowl buckle, the lower bowl buckle, the cross bar joint and the limit pin on the upper bowl buckle.
Q:people who have an industrial/scaffolding piercing?!?
Actually getting it pierced isn't all that painful, it's the couple of weeks after that might hurt...but as long as it's looking after properly (cleaned every day) all should be good. Sleeping on it can be painful, so i would suggest you get the side pierced that you don't usually sleep on. As for taking your mind off it, maybe take someone in with you while you get it done? then you can either talk to them to distract you or just squeeze their hand...also try not to look at the needle as this could just scare you, don't worry too much though, it'll all be over and done with in a few seconds and the pain really isn't that bad. As well as making sure you clean it every day, it's also important to make sure you're not playing with/touching it all the time as this could lead to an infection, always make sure your hands are clean before touching it. That industrial bar looks really nice, i would aim on waiting a couple of months before putting it in though maybe even about 4-5 months. Overall i think you should defiantly get it pierced the look really nice, good luck!! :)
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m
Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:Scaffolding Piercing Help?!?
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.
Q:]How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range