GRP FRP Pipes Sea Water Pipe Series DN 125
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Features & Benefits of GRP FRP pipe sea water pipe series
Corrosion-resistant
•Long, effective service-life materials
•No need for linings, coatings, cathodic protection, wraps or other forms of corrosion protection
•Low maintenance costs
•Hydraulic characteristics essentially constant over time
Light weight
(1/4 weight of ductile iron; 1/10 weight of concrete)
•Low transport costs (nestable)
•Eliminates need for expensive pipe handling equipment
Long standard lengths
(6, 12 metres)
•Fewer joints reduce installation time
•More pipe per transport vehicle means lower delivery costs
Extremely smooth bore
•Low friction loss means less pumping energy needed and lower operating costs
•Minimum slime build-up can help lower cleaning costs
Precision sealability
With elastomeric rubber rings
•Tight, efficient joints designed for bell & spigot to eliminate infiltration and ex-filtration
•Ease of joining, reducing installation time
• Accommodates small changes in line direction without fittings or differential settlement
Flexible manufacturing
•Custom diameters can be process manufactured to provide maximum flow volumes with ease of installation for rehabilitation
lining projects
High technology pipe design
•Lower wave celerity than other piping materials can mean less cost when designing for surge and water hammer pressures
High technology pipe manufacturing system producing pipe that complies to stringent performance standards (AWWA, ASTM, DIN, EN, etc.)
•High and consistent product quality worldwide which ensures reliable product performance
Control Testing of GRP pipe sea water pipe series
Raw Materials
Raw materials are delivered with vendor certification demonstrating their compliance with Zhongfu Lianzhong quality requirements. In addition, all raw materials are sample tested prior to their use. These tests ensure that the pipe materials comply with the specifications as stated
Physical Properties
The manufactured pipe’s hoop and axial load capacities are verified on a routine basis. In addition, pipe construction and composition are confirmed.
Finished Pipe
All pipes are subjected to the following control checks:
• Visual inspection
• Barcol hardness
• Wall thickness
• Section length
• Diameter
• Hydrostatic leak tightness test to 1.5 rated pressure (only PN6 and above)
On a sampling basis, the following control checks are performed:
• Pipe stiffness
• Deflection without damage or structural failure
• Axial and circumferential tensile load capacity
Thickness and Weight of Standard Pipes based on Internal Pressure of GRP pipe sea water pipe series
1. Internal liner (thickness 1.0 – 2.0 mm)
In tables bellow thickness include 1.5mm of liner and minimum pipe Stiffness 1250 Pa
2. Mechanical resistant layer in glass filament winding (based on internal pressure)
3. Top coat (0.2 – 0.3mm) . In tables bellow thickness include 0.2mm of top coat
Unloading,Handling,Transportation and Storage of GRP pipe sea water pipe series
Unloading and Handling Pipes
Unloading the pipe is the responsibility of the customer. Be sure to maintain control of the pipe during unloading. Guide ropes attached to pipes or packages will enable easy manual control when lifting and handling. Do not drop, impact, or bump the pipe, particularly at pipe ends.
If at any time during handling or installation of the pipe, any damage such as a gouge, crack or facture occurs, the pipe should be repaired before the section is installed.
Transporting Pipes
Strap pipe to the vehicle over the support points using pliable straps or rope. Never use steel cables or chains without adequate padding to protect the pipe from abrasion. Bulges, flat areas or other abrupt changes of curvature are not permitted. Transport of pipes outside of these limitations may result in damage to the pipes.
Site Pipe Storage
It is generally advantageous to store pipe on flat timber to facilitate placement and removal of lifting slings
around the pipe.
When storing pipe directly on the ground, be sure that the area is relatively flat and free of rocks and other
potentially damaging debris. Placing the pipe on mounds of backfill material has been found to be an effective
way of site storing the pipe. All pipes should be chocked to prevent rolling in high winds.
FAQ of GRP pipe sea water pipe series
Q1: What’s the performance standards?
Lianzhong pipe is designed to meet all of these ASTM , AWWA, BS, DIN standards.
Q2: What’s the qualification testing for the products?
Lianzhong pipe has been rigorously tested to verify conformance to the ASTM D3262, ASTM D3517, AWWA C950 and DIN 16868 requirements
Q3: How long can I receive my goods?
A: Usually, we will deliver products within 20 days after the contract is signed. Delivery time is negotiable when necessary.
- Q:Glass fiber reinforced plastic GRE pipe broken hole how to repair and repair?
- Resin selection of good points, the general also line, as well as accelerators, curing agents, high-quality glass fiber cloth.
- Q:Underground garage inorganic glass fiber reinforced plastic wind pipe water out of the way?
- The condensed water duct wall: when the fan start, rapid air circulation in the inorganic pipeline flow, pipeline internal and external space of large temperature difference, leading to the underground garage of the water vapor condenses into water droplets freeze in the outer wall of the pipe. At this point, on the surface, it seems to seep through an inorganic pipe;
- Q:Which is better, PVC pipe and GRP pipe?!
- Depends on location, and design requirements. Nowadays FRP is in the majority.
- Q:What kind of diamond saw blade for cut glass steel pipe?
- Diamond saw blade is a kind of cutting tool. It is widely used in the processing of concrete, refractory, stone, ceramics and other hard and brittle materials. The diamond saw blade is mainly composed of two parts: matrix and cutter head. The matrix is the main supporting part of the bond of the cutter head, the cutter head is the cutting part during use, the cutter head can be in use and constantly consumed, and the matrix is not, the cutter head is able to cut the role because it contains diamond, diamond as the hard material of it friction cutting object is processed in the knife head. The diamond particles are wrapped in metal inside the cutter head.
- Q:Galvanized steel sheet and inorganic glass fibre reinforced plastic pipe are calculated according to this norm or norm
- 1, the quota valuation, wind pipe materials, such as the "loss" of galvanized steel has been included in the quota content, including the lap and material loss, making the wind pipe.2, when calculating the actual material, it can be calculated according to the calculation area of the air pipe * (1+ fixed loss) = the actual amount of material used.
- Q:Would like to ask about the plastic lined steel pipe, steel pipe, glass steel skeleton, the advantages and disadvantages of each ceramic pipe, to know a friend told, very grateful!
- FRP corrosion resistance, high strength (afraid of tanks), light quality, easy to install, socket or flange interface, the price is more expensive than cement
- Q:A basic overview of FRP pipes
- FRP pipes are made of resin (feed water, food grade resin), glass fiber and quartz sand as raw materials and made by special process.
- Q:How long is the service life of glass fiber reinforced plastic pipes?
- Glass fiber reinforced plastic grille can reduce power consumption and simplify management. Galvanized grille plate adopts high efficiency and low resistance water collecting device, floating water rate is less than 0.001%, environmental protection is the best. The galvanized grating plate has the advantages of advanced structural design, optimum matching of gas and water, and sufficient heat exchange, with the same level in foreign countries and superior output. The company has a realistic, innovative research team. The galvanized grille fan adopts a tensile type of strong wind blade and long space, which is more stable when the fan is running, thereby reducing noise and greatly improving the cooling efficiency. Successively in Shanghai, Guangdong, long-term and domestic famous universities, research institutes cooperation. Hebei, Qingdao and Beijing have additional production bases and service liaison points. Willing to work with new and old customers to create a beautiful today, Chinese and foreign.
- Q:What kind of material is the pipe of the pipe that installs the pressure transmitter of GRP conduit? Is it fiberglass or carbon steel?
- It is generally assumed that it is made of glass fiber reinforced plastic. The main pipe is made of glass fiber reinforced plastic. The medium is corrosive. Other materials must not be suitable
- Q:How to install FRP pipe correctly
- Glass tube and carbon steel pipe connection, at present, the most reliable way of connection is indeed onlyOther, such as on-site bonding, because of the two kinds of material is not the same, the quality of bonding is not very stable!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
GRP FRP Pipes Sea Water Pipe Series DN 125
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords