Good Quality PVC Door Frame TCF140E-45

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Our factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.

  We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.

  We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.

Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I would like to ask, the interior wall plaster door window frame a few centimeters ah, the external wall insulation board wiping the surface of the door window frame a few centimeters ah?
The thickness of the plaster is the thickness of the box.
Q:Do you want to eat the windows and doors?
Door and window out of the plaster is to eat a little window frame, probably the principle is: the wall plastering door frame 5 mm or so, elegant approach should be silicone edge (where you are rough delivery). External wall insulation board wiping the surface of the laminated window frame is not greater than 1 cm, pay attention to the edge of the silicone must be, here is the weak water seepage.
Q:What is the box method installed in the doors and windows?
Sub-box installation is another way to install plastic doors and windows. It is in the hole to install a sub-box, sub-box in the foot directly into the cement mortar wall, sub-box installation must ensure that the horizontal and vertical, so that the installation of the window can be achieved to achieve horizontal and vertical. With this installation method, the doors and windows frame and the wall completely out, and can be completed in the cement mortar after all, so it will not cause pollution. In addition, due to the use of the sub-box, so that the installation quality of doors and windows easier to get control, but also reduce the plastic doors and windows due to thermal expansion and contraction caused by the expansion and contraction.
Q:The installation method of color steel activity room
Caigang activity board room and building almost the same, will be around and the wall foundation leveling, the best use of reinforced concrete, more solid; and then column, with the beam will be linked to the skeleton, the partition, the outer wall and the door window frame; Followed by laying the floor, and then put a layer of upward, and then on the roof and roof panels; the final installation of doors and windows, pull vertical support. There is sanitary ware, ah, hardware and the like. In fact, this is the light steel structure, and the heavy steel structure plant is very similar to the color of steel activities room hidden project is in the construction process, after the completion of a process, will be covered by the next process, all can not be completed after the inspection site , Do the room decoration, "hidden project" is the key, if the "hidden project" is not done, the surface decoration was beautiful, but also in vain. "Hidden project" can be divided into water installation, electrical installation and moisture, water and other projects. Each of which can not be ignored, if any link is a problem, may bring serious economic losses, and even harm to personal safety. Waterproof construction of the construction process and material identification, to avoid unnecessary economic losses and injuries.
Q:The concrete process and scope of application of new wall construction method
Q:Plastering and doors and windows installed in the order
Usually first fitted with a door cover and window cover, and then plastering the wall, then install the door and window.
Q:Do you have the order to install the floor and window? What order is it right?
This is not the absolute order of the two, mainly to see their own preferences it
Q:What is the window frame section
A cross section of a door frame or window frame. A door frame or window frame. Is the excessive part of the window and the wall. Usually rectangular. The door and window frame is fixed on the wall where the wall is left. Doors and windows on the windows and doors frame. Section refers to: the profile of the object, can reflect the details of the internal structure of the object. Door frame section generally refers to the cross-section structure or structure of the material constituting the door frame.
Q:How to deal with waterproof coatings on aluminum windows
With a rosin perfume just fine! Give you a picture to see!
Q:Broken bridge aluminum screens how to go up
There is a hand drill, to fix the screw 1

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range