Good lift parts elevator overload sensor, low cost load cell EWD-GB match EWD-RL-SJ3

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10000件 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

EWD-RL-SJ3 elevator load weighing device

l This system can be adopted to all kinds of elevator with three -way

  switch and 1 analog output port.

l Main features: Ultrathin character “” load sensor to direct detect the changes of the car load, there is no need to change the traction taper sleeve rod.

1.  All operating parameters can be set at the spot.

2.  The unique programmable output signal control method can meet the the requirements of the weighing signal of varieties of fixed car platform.

3. It is easy to operate the self-learning model at the spot. The user can choose 20~100% rated self-learning model or rated set model, quite easy to operate.

4. With the ability to amend the working parameters automatically and

self-adoption intelligent landing compensation.

5. With simulation - 10 ~ + 10 V voltage output port, matching with the speed controller to improve the performance of the elevator.

6. Small volume, convenient installation, low prices.

l Technical parameters

1.

Application

Being applicable to all traction elevators fixed car platform (less than 60 landings) with the load of 500kg-5000kg.

2.

Floor Compensation

Auto accommodating to the following compensation methods: Up and down leveling; Up command +door zone; Fuzzy and intelligent.

3.

Sensitivity

Elevator Rated Capacity/200 (Example: The rated capacity is 1000kg, and the sensitivity is 5 kg) [This data may be affected by elevator mechanical performance]

4.

System error

0.5%(5-40)

5.

Non-linearity

0.5%

6.

Compensation

The method of circuit parallel connection is applicable to the signal source system of DC 12-32V. Also, the interior fault of this system does not affect the original operation mode of elevator.

7.

Output mode

Relay

Programmable universal signal

3-channel programmable output models are: no load, light load, semi load, full load, heavy load, rated load, and overload(customer may set the changing range freely.)

Each channel can be programmed as dynamic Close or Open contact.

Contact Capacity: DC/AC 48V/100mA

Analogue quantity

Overall Compensation Range 0-10V, -10V~+10V. 0V~+5V

8.

Ambient Temperature

Temperature: -20~50

9.

Relative Humidity

20%-90%RH

10.

Reaction Time

0.5 Second, The communication distance between the intelligent and control is 0-400m.

11.

Power Supply

AC/DC24(±10%)V/200mA

12.

Installation place

Sensor section: A the place of traction rope shackle

Controller section: control Cabinet in machine-room. See the figure 3 for installing dimension.

13.

Overall size

Sensor section: see figure[3]: controller section115×90×40mm3


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of material is better for food packing box?
In the plastic classification, the PET code number is 1, widely used: mainly for electronic and electrical equipment, including: electrical sockets, electronic connectors, rice cooker handle, TV deflection yoke, terminal taiwan
Q:What's the price difference between feed packer and organic fertilizer packing machine?
So in this parts material to the high requirements, each component costs are not the same, the price of natural Many a little make a mickle., also went up.
Q:Decocting machine for packaging liquid out of control, can not control how much liquid packaging
If the liquid is not automatically turn off the power, bet, please check the copper into medicine bag (liquid level probe) soiling, connecting wire level probe is loose behind.
Q:How to package machined parts?
If it's not rusted, clean it and wrap it in a bubble bag. Place it in a cardboard box or wooden case
Q:A workshop needs to be packed with machine parts. 5 boxes are packed in 80
5 boxes, 80 boxes, =16 20 boxes, only 320 can not be loaded
Q:What is the definition of machining process specification?
The process of directly changing the shape, size, and surface quality of a blank to make it part of a process is called a machining process
Q:What assembly does the vacuum packer require?
Vacuum chamber, etc.. Qingdao AI Xun vacuum packaging machine using high quality parts and components, to ensure the quality and life of the whole machine.
Q:Single vacuum packaging machine accessories, vacuum schedule, where to sell?
Vacuum packaging machine parts, it is best to buy from the original manufacturers, because many vacuum packaging machine, although the main technology is similar, but there will be many differences in detail, size will vary
Q:The standard problem of parts in mechanical drawing
A total length of a certain truth, such as easy cutting, easy processing (such as the big machine, easy to heat treatment), ease of assembly, so that people see, you should take control of size is not important for the free length to form a closed size.Mechanical drawing dimensioning can improve product quality and improve production efficiency, which is not necessarily inconsistent with mechanical drawing standards, which has a lot to do with practical experience, especially the choice of benchmark.
Q:Can the nylon vacuum packing bag be high and low temperature with mechanical parts?
Nylon vacuum packing bag has high temperature resistance of 90 degrees Celsius, low temperature, freezing, quality preservation, freshness preservation and odor preservation.And applies to hardware machinery parts.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range