GOLDEN PRINCE CONCRETE MIXER TRUCK, 10CBM, 6X4

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

BRAND OF CHASSIS: GOLDEN PRINCE

CHASSIS MODEL: ZZ5251GJBN3841A/N Mixer
General Configuration : Golden Prince,336HP,6×4,Europe Ⅱ,10 Meter Cubic

Mass ParametersTotal Weight (kg)25000
Volume (Meter Cubic)10
Size ParametersOverall Dimensions (mm)Length8935
Width2496
Height3875
Distance between Axles (mm)3750+1350
Performance ParametersMax. Driving Speed (km/h)74
Economic Speed (km/h)60
Recommended ConfigurationEngineWD615.69
GearboxHW15710
Rear AxleHC16
Oil Tank (L)300
Suspension (front/rear spring)10/12
Tire12.00-20

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it possible to mix the concrete in a mixing truck for eight hours?
When the concrete is removed from the mixture, it is best not to exceed 150min according to the temperature. But now with the development of the additive technology, and high performance concrete initial setting time and perhaps even control to 13-15 hours (Shanghai world financial center base raft concrete). You can discriminate in this way. Concrete stirred 8 hours, not casual water, workability change is not very big, can use, but 1 can back, part of discharge, stir some higher than the another two grades of concrete, quick stir for a few minutes and pouring into the part or not is not very important part of the bearing. According to the admixture, add admixtures, whisk for 3-4min, and reduce the use of one or two grades. If you have added a lot of water to the site, there has been a significant change in the ease of use.
Q:How many cubic meters of concrete mixer transport vehicle
Dongfeng 140 concrete mixer truck, dongfeng 145 concrete mixer truck, dongfeng 153 concrete mixer truck, dongfeng hercules concrete mixer truck, dongfeng tianlong build concrete mixer truck concrete mixers, liberation, steyr, concrete mixer truck concrete mixer truck, hongyan, Europe man special concrete mixer truck concrete mixers and other projects.
Q:What can be done to remove the concrete from the concrete mixer truck
The shovel shovel Conditional to buy a pneumatic spatula knife, only to find in the area of material removal lon-izing dozen, can a small amount of hydrochloric acid or outside the shovel shovel shovel, car or flushing timely, keep clean can adhere to, once the dirty is not in the mood in the lane
Q:What is the car for concrete
Concrete cars are called concrete mixers (concrete cars), which are used for transporting concrete concrete trucks for construction purposes. Because of its appearance, it is also commonly referred to as the tian.
Q:What is the purpose of the concrete mixer
The main purpose of the mixer is to transport concrete or slurry that is already in a concrete mixer to the construction site. Due to concrete truck mixer mixing tank is adjustable speed rotating stirring, so the concrete mixer truck transport can maximum guarantee stipulated in the delivery distance and time not segregation, coarse aggregate is not settling, maintain good workability; Mixed soil mixer is used for the construction of hybrid stations and large projects. Another concrete mixer is used for carrying water that can carry the same amount of concrete as the payload.
Q:What is the meaning of the word "concrete" in the concrete mixer jar?
The "concrete" means "concrete" means "concrete". This is not to say that the car must print these two words, depending on the company. But I know the name of the company and the company.
Q:How many years does the concrete agitator truck go away?
A. wanxiang rotation is part of the fault area. The grease should be added on time, and the wear condition should be checked regularly to repair the replacement. The team should have a spare, versatile shaft assembly to ensure that the work will be restored within a few minutes once the malfunction occurs. B. keep the hydraulic oil clean. It is necessary to prevent the sewage and silt from entering the hydraulic system. Hydraulic oil should be changed regularly according to the manual. Once the water or silt is found in the hydraulic fluid, the hydraulic system and the hydraulic oil are replaced immediately. C. ensure the hydraulic cooling unit is effective. Be sure to clean the hydraulic oil radiator regularly, prevent the radiator from being blocked by cement, check whether the radiator electric fan is running properly and prevent the hydraulic oil from exceeding the temperature. The hydraulic part should be clean only for hydraulic oil, usually not very much. But unlike manufacturers, service life is different
Q:Does it affect the ease of mixing too long?
The site stirring, the quality is not easy to control, the site pollution is serious for the main reason, the construction committee has the file request, so all do not stir in the scene.
Q:How many layers of steel wire tyres are used in concrete mixers
Concrete agitator truck tyres are usually used in 18 levels of steel wire tyres, which is used in 20 levels
Q:How did the concrete agitate the concrete
Is not fully mixing concrete concrete truck mixer, concrete mixing transporter in the moving process of mixing is just to prevent tank (concrete mixer truck loaded tank is provided by the ready-mixed concrete mixing station) concrete segregation phenomenon.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range