Geogrid / Steel Plastic Composite Geogrid

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
500 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Black 100% new raw material steel plastic geogrid

suppliers from china

Description 

     Plastic biaxial geogrid with high strength steel wire (or other fiber), through special processing, and polyethylene (PE) or polypropylene (PP), and adding other assistants, by extrusion into composite type high tensile belt, and the surface is rough textured, for high strength reinforced geotextile strips. The single band, the longitudinal, transverse certain space preparation or clamping arrangement, with special reinforcement welding technology welding the connection point bonding and molding, is reinforced with Geogrid. 

Properties

      High stength,small deformation, homogenous stucture, easy for constrution etc. 


Application 

      Make reinforcement treatment for varions kinds of sot soil foundation and strengthen shearing resistance of the soil body,used in reinforcement of retaining wall and widening of old road. 

      It is also used as protect-support net in the coal mine when layer mining of thick (coal) seam, and support of road way in the coal mine. 

Specification 

Specifications

GSZ30-

30

GSZ40-40GSZ50-50GSZ60-60GSZ80-80

GSZ100-

100

GSZ150-150
Tensile   Strength KN/m(LD)≥30≥40≥50≥60≥80≥100≥150
Tensile   Strength KN/m(TD)≥30≥40≥50≥60≥80≥100≥150
Elongation   Rate(LD TD)≤2≤2≤2≤2≤2≤2≤2
Tensile Strength at 1% Elongation Rate(LD)≥20≥32≥40≥48≥63≥81≥125
Tensile Strength at 1% Elongation Rate(TD)≥20≥32≥40≥48≥63≥81≥125
Limit PeelForce at Welded Bonded Point N≥100≥100≥100≥100≥100≥100≥100
Products in the range of coal mineFire out time from outer   flam≤3
Surface   resistivity<1×109< span="">


Packaging Details:according to your need
Delivery Detail:7days


Geogrid / Steel Plastic Composite Geogrid





Geogrid / Steel Plastic Composite Geogrid

Geogrid / Steel Plastic Composite Geogrid

Geogrid / Steel Plastic Composite Geogrid

Geogrid / Steel Plastic Composite Geogrid

Geogrid / Steel Plastic Composite Geogrid

 

FAQ

1. How about the delivery time?   

    Lead time since receipt of 30% T/T deposit payment: 3 weeks.   

2. What kind of payments does jenor support?  

  T/T, L/C, Cash are accepted.

3. What's are the MOQ?  

    We can according to your condition to set the MOQ.

    And we can provide you samples for quality inspection. 

4. Do you charge for the samples?  

    Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee If you set the order . 

5. Can you produce the product according to customers' requirements ?   

    Sure, we are professional manufacturer, OEM and ODM are both welcome.

6. Can you tell me your main customers?   

    That's our customers' privacy, we should protect their information.   At the same time, please rest assured that your information is also safe here.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Geotextile manufacturers which good?
Needle punched nonwoven fabric and PE film composite geotextile:A specification film cloth, a cloth film two, maximum width of 4.2 meters is the main raw material to use acupuncture non-woven polyester staple fiber, PE film by composite, is mainly used for seepage control, applicable to rail, highway, tunnel, subway, airport project. Geotextile manufacturers can choose Wo environmental protection
Q:In the middle of geogrid foundation treatment process is belongs to the concealed work it
According to the definition of concealed engineering
Q:How many steel wire two-way steel plastic geogrid tensile strength reached 100kn/m
Hello, this is not a question of how many wires,
Q:What is the difference between plastic geogrid and grid
Geogrid is suitable for various kinds of dams and subgrade reinforcement, slope and tunnel wall reinforcement. Large airport, parking lot, wharf freight yard and other permanent bearing foundation reinforcement.
Q:Which is better than geotextile and geogrid
Geotextile is mainly used in water conservancy for anti reflection
Q:History of geotechnical materials
Geosynthetics are widely used in geotechnical engineering at present, which is a general name of polymer products. As early as in 1920s, the chemical industry was successful in the production of synthetic materials, but it was not until the late 50s that the material was gradually used as a new type of building materials to be used in geotechnical engineering. In the early stage, the products were mainly pervious to spinning and non-woven geotextiles, and later produced impermeable geomembrane. With the requirement of engineering practice and the improvement of manufacturing technology, the geogrid and other composite products with high strength reinforcement are manufactured. In this way, the original geotechnical fabric word has not summarized all kinds of products in the international meaning, so there are many alternative names, the geotextile material was the most common, but the habit still referred to as geotextile. Geotechnical material is divided into several categories of materials: geotextile, geomembrane, geogrid, drainage board, composite geomembrane, geotextile, geocell, bentonite waterproof blanket, etc..
Q:Who knows how much the staggered distance of the lap joint of the geogrid is?
Straight and smooth and close to the cushion, all longitudinal or transverse lap joints should be staggered, overlapping length shall not be less than 300MM.
Q:Biaxial tension geogrid
In addition, there are steel plastic grille, fiberglass geogrid and so on
Q:Anchorage length of Geogrid
The old cement pavement maintenance, use method and injection method of self-adhesive, glass fiber grid in the original road, also can do fine 20mm-30mm asphalt concrete leveling layer in the original pavement, then laying fiberglass geogrid, and asphalt concrete pavement, thickness should be 60-100mm.E. the new road surface layer can be anchored method, self adhesion method for construction.
Q:What is the purpose of this approach for the treatment of geogrid slopes in embankment slopes?
The main purpose of filling subgrade is to use geogrid, which is to prevent the longitudinal cracking and sliding. As for Geogrid, it can not directly stabilize the slope, but also rely on geotextile wrapped. As for the soaking embankment, in addition to the use of Geogrid and geotextile, but also consider the problem of slope protection (such as stone, concrete surface etc.).Geogrid is usually used to fill the embankment with high height, in order to play a role. Also, you said that the protection of the ramp laying 1.4 meters, the laying of the roadbed in the area of 1.6 meters, these are trivial, can only play a part of the role of little. See you use the material is plastic geogrid, this is the worst kind of material, the strength is very low. Small size, low strength, not as good as the use of woven bags stacked slope. I guess this is a low grade road

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range