Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
100 carton
Supply Capability:
50000 carton/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Features :
1. Maintenance-Free Operation 
Absorbent Glass Mat (AGM) technology ensures efficient gas recombination up to 99% and freedom from electrolyte maintenance. During the expected float service life of batteries, no need to check the specific gravity of the electrolyte or add water.
2. Good Discharging Ability
Tight assembly technology ensures an excellent high-rate discharge performance.
3. Long Service Life
A unique corrosion-resistant grid alloy ensures batteries have long service life.
4. Low Self Discharge
Using high purity raw materials ensures batteries have less self-discharge.
5. Environmental & Non-polluting
Gas Recombination technology ensures the battery high seal reacting rate, which can prevent the acid fog from separating out.
6. Safe & Reliable
Efficient venting system automatically release excess gas when the pressure rises above the normal level & reseals the valves when it returns to the normal rate, which can protect the battery from bursting.

Applied Scope :
1. Communication Systems: Switch, Microwave Stations, Mobile Base Stations, Data Centers, Radio and Broadcasting Stations
2. Motivity Field: Robots, Electric Toys, Electric Tools & Portable Vacuum Cleaners
3. Solar & Wind Power Generation Systems
4. Signal System & Emergency Lighting Systems
5. EPS & UPS Systems

 

ModelSEL 100-12
Voltage12V
Capacity100AH  (C20)
97AH    (C10)
90AH    (C5)
79AH    (C1)
Dimension (mm)lenth: 407
width: 172
height: 214
total height: 238
Weight29KG
Maintenancefree(valve regular)
Working terperature-40°C~60°C
Floating life5 years
Design life5 years
Warranty2 years
Discharge details
DoD data  3000-3500 (25%)
600-800(75%)
200-300(100%)
Self discharge (25°C)91%(3 month)
82%(6 month)
64%(12 month)
Internal Resistance4.9 Ω (Fully charged battery at 25°C)
Material 
Grid Plate CaPb alloy, PbSn alloy, PbSb alloy
Diachylon 1# ceruse(99.99%)
Liquid Dilute sulfuric acid
Terminal Lead, Zinc, Copper
Shell PC\ABS
OriginalChina

 

Anatomy                                                                      

 

FAQ

1.   How do I decide which system is right for me ?

For protection from long outages, include a generator or solar panels in your Must solar system. Shorter outages can be handled by a battery-only system.

2.    Where my system will be installed ?

Must solar systems are usually wall-mounted near a home's main electrical (circuit breaker) panel.

3. How do I install my system ?

A solar backup inverter is connected to a home electric system , we will supply detailed installation manual and videos for our customers .

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is the GIS in the electric power high voltage switch cabinet
IS is a shorthand for two conceptsThe 1 is the geographic information system.2 refers to the (GAS INSULATED SWITCHGEAR) gas insulated fully enclosed combination of electrical appliances, closed inside the main circuit breaker, isolation switch, grounding switch, bus, lightning arrester, etc.. Many power plants, substations, switching stations are made of GIS, so that the small footprint, or maintenance. With the high voltage switch cabinet or not.
Q:What is the specific content of power engineering commissioning
First, the main contents of the commissioning of power engineering are as follows:1, familiar with the one or two circuit wiring, the examination of the drawings, the 10kV and 110kV of the electrical test of the one or two equipment, the protection device test;2, equipment debugging, test process data record analysis and problem solving;
Q:The concept of "remote message" in communication and power equipment
Remote signal to speak a little bit is the alarm signal, switch position signal to the control room
Q:The production and transportation process of electric power
The equipment of the two system comprises a measuring device, a control device, a relay protection device, an automatic control device, a DC system and necessary auxiliary equipment. Power system voltage level has 220V, 380V (0.4 kV), 3 kV, 6 kV, 10 kV, 20 kV, 35 kV, 66 kV, 110 kV, 220 kV, 330 kV, 500 kV, 750kV, 1000kV. With the improvement of motor manufacturing process, 10 kV motor has been mass production, so the use of kV, 6 kV has been less than 20 kV, 66 kV is also rarely used. The power supply system is 10 kV and 35 kV. Transmission and distribution system to 110 kV or above. Power plant generator has 6 kV, 10 kV and, with a total of 20 kV, users are 220V, 380V (0.4 kV) low voltage system 20kV.
Q:What is the definition of abnormal equipment, equipment failure, equipment failure, equipment accident
Obstacles: not clear, probably not normal and must be modified to be normal,If the circuit breaker parameter is not appropriate, change the parameter specification.
Q:Pre checking and checking of goods in power system
Pilot: the full name of the preventive test, generally in terms of a power system equipment, in order to find in the operation of equipment problems, to prevent the occurrence of accidents or damage to equipment, equipment for inspection, testing or monitoring, including oil sampling test or gas samples. The preventive test is the operation of power equipment and to maintain an important aspect of the work
Q:In power system, the general conditions for the selection of electrical equipment are
Electrical equipment to be as reliable as possible, must be selected according to the normal working conditions and the short circuit conditions for a variety of checks (such as thermal stability check and dynamic stability check)For some equipment also need to check the special items, such as circuit breakers and fuses to check the ability to break the current, the current limiting reactor to check the normal voltage loss and bus residual voltage, etc..
Q:Design all equipment in the power system
Primary equipment is:The power plant and substation, generator transformer (step-up / step-down transformer), busbar, circuit breaker, isolating switch, current transformer, voltage transformer, insulator, reactor, lightning protection equipment (arrester, lightning), grounding device, electric energy metering.Business side: step-down transformer, circuit breaker, isolating switch, current transformer, voltage transformer, insulator, lightning protection and grounding device, the internal power supply generator, reactive power compensation cabinet, electric energy metering,
Q:What are the necessary equipment for power line project?
There are connection tools, such as hydraulic pliers, crimping pliers, pressing tools, connecting tube, detonation pressure tube; the last is a measuring device, theodolite, rod, etc. in addition to the measuring rod; excavation tools such as shovels, iron, hammer and so on.
Q:I would like to open a company on the construction of power equipment, what needs to be prepared?
The second is the power facilities installation, repair and testing qualification. Also divided into one to four, respectively, by the State Electricity Regulatory Commission, power supervision bureau and the city in the county, the county's dispatched office - to do the examination and approval of the electricity office. In some places there may be five, is designed for the establishment of the company.As for the size of the funds, different levels of economic development, the requirements are different, only to the location of the business sector consulting.In the actual participation in bidding and other construction activities, be sure to carefully read the tender documents and other construction projects, different projects for different requirements of different qualifications.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range