Gel System Inverter Sealed Lead Acid Agm 12V 24ah Battery

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
100 carton
Supply Capability:
50000 carton/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Features :
1. Maintenance-Free Operation 
Absorbent Glass Mat (AGM) technology ensures efficient gas recombination up to 99% and freedom from electrolyte maintenance. During the expected float service life of batteries, no need to check the specific gravity of the electrolyte or add water.
2. Good Discharging Ability
Tight assembly technology ensures an excellent high-rate discharge performance.
3. Long Service Life
A unique corrosion-resistant grid alloy ensures batteries have long service life.
4. Low Self Discharge
Using high purity raw materials ensures batteries have less self-discharge.
5. Environmental & Non-polluting
Gas Recombination technology ensures the battery high seal reacting rate, which can prevent the acid fog from separating out.
6. Safe & Reliable
Efficient venting system automatically release excess gas when the pressure rises above the normal level & reseals the valves when it returns to the normal rate, which can protect the battery from bursting.

Applied Scope :
1. Communication Systems: Switch, Microwave Stations, Mobile Base Stations, Data Centers, Radio and Broadcasting Stations
2. Motivity Field: Robots, Electric Toys, Electric Tools & Portable Vacuum Cleaners
3. Solar & Wind Power Generation Systems
4. Signal System & Emergency Lighting Systems
5. EPS & UPS Systems

 

ModelSEL 100-12
Voltage12V
Capacity100AH  (C20)
97AH    (C10)
90AH    (C5)
79AH    (C1)
Dimension (mm)lenth: 407
width: 172
height: 214
total height: 238
Weight29KG
Maintenancefree(valve regular)
Working terperature-40°C~60°C
Floating life5 years
Design life5 years
Warranty2 years
Discharge details
DoD data  3000-3500 (25%)
600-800(75%)
200-300(100%)
Self discharge (25°C)91%(3 month)
82%(6 month)
64%(12 month)
Internal Resistance4.9 Ω (Fully charged battery at 25°C)
Material 
Grid Plate CaPb alloy, PbSn alloy, PbSb alloy
Diachylon 1# ceruse(99.99%)
Liquid Dilute sulfuric acid
Terminal Lead, Zinc, Copper
Shell PC\ABS
OriginalChina

 

Anatomy                                                                      

 

FAQ

1.   How do I decide which system is right for me ?

For protection from long outages, include a generator or solar panels in your Must solar system. Shorter outages can be handled by a battery-only system.

2.    Where my system will be installed ?

Must solar systems are usually wall-mounted near a home's main electrical (circuit breaker) panel.

3. How do I install my system ?

A solar backup inverter is connected to a home electric system , we will supply detailed installation manual and videos for our customers .

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the power plant
Production of generators and other power generation equipment, and some will produce some electricity, belonging to the state monopoly of the infrastructure industry.
Q:Is there a warranty period for power equipment?
Warranty period is not specified, is determined by the relevant test standards
Q:Withstand voltage test, power equipment insulation unqualified reasons?
Without proper consideration of the atmospheric conditions that affect the insulation characteristics. Because of the pressure, temperature and humidity have a certain impact on the spark discharge voltage and breakdown voltage, without considering these factors may lead to equipment failure.
Q:Ask the expert about the design of the power system diagram, 6kV side of the electrical equipment how to supply
For 35/6KV step-down stationEach line with the 6/0.4KV transformer, or 6KV equipment (such as 6KV synchronous motor), are the load of the stationSo, there are 6KV devices, single occupancy 6KV bus on a certain line can be
Q:The state of power system equipment is divided into four states
(1) running state. The isolating switch and circuit breaker of the equipment are in the closing state, and the circuit is connected between the power supply and the receiving end.(2) hot standby. The circuit breaker of the equipment is disconnected, and the isolating switch is in the closing state. (3) cold standby. The circuit breakers and disconnecting switches of the equipment are in the open position.
Q:What is the importance of annual maintenance of electrical equipment
The necessity of power equipment testingPower equipment is the hub and channel in the transmission and distribution network, in the course of the use of equipment will be aging, disrepair, hidden trouble, etc.. However, these situations can not be ruled out by the eyes of the people, the staff of the experience, it is necessary to detect the special power equipment to check out these security risks and the organization of human resources in a timely manner to exclude.In the operation of electric power, the safety of electric power has always been a chord of the electric power. Power equipment testing is actually played a role in prevention and detection of hidden dangers. So it is very important to detect the electric equipment (i.e., the preventive test of electric equipment).
Q:Is the installation of railway communication, signal and power related to mechanical and electrical engineering
Communication signal power belongs to mechanical and electrical installation engineering. However, it is different from the mechanical and electrical installation of industrial equipment, especially the railway communication and signal system. The main differences are the following points: 1, mechanical and electrical installation is mainly refers to the installation of equipment, power, monomer debugging, linkage commissioning commissioning. Railway communication, signal, power, but there is a very strong system requirements, including the total network management system debugging, and other railway system of professional linkage debugging. For example, the signal CTCS system, track circuit and the coordination of the work system commissioning; and passenger cars, motor vehicles, truck station shunting system linkage debugging, etc.
Q:Buildings, factories, institutions, power distribution room of the power equipment as required
In the vicinity of the power grid in the supply of power on the requirements of their own generators to ensure that the dual power supply. Factories and institutions to see what the main work, if it is steel, hospital, such as the load category one or two categories of power needs of the dual power supply. And the load such as electric furnace, easy to produce harmonics, in order to ensure the power quality of the grid, it requires the installation of harmonic elimination device.
Q:What is the GIS in power system
Three Gorges Left Bank GIS a total of 39 switches. Left a total of 8 units of power station and the Three Gorges to Wanzhou 1 line, the Three Gorges to Longquan 1 lines, 2 lines, Three Gorges to Longquan Three Gorges to Longquan 3 lines of four circuits? Left two power plant a total of 6 units and the Three Gorges to Jingzhou 1 lines, 2 lines, Three Gorges to Jingzhou Three Gorges to Jingzhou 3 line etc. three lines.Three Gorges left bank power plant using international bidding procurement, GIS by the internationally renowned manufacturer ABB in 1999, the successful supply installation. The utility model relates to a metal sealed off phase structure, the generator transformer adopts a unit connection, and the two unit wiring is combined into a switch unit which is connected with a joint unit to connect the 3 / 2 wiring. Bus segment, 3 / 2 wiring of the 7 strings, a series of double switch off. GIS net size of about 581.5 meters long, width of 15 meters.
Q:In order to obtain the qualification test of electric equipment
The provincial electricity supervisor application; can only apply for five (10KV and below) or level Four (35KV and below) qualification, the first level of qualification can only apply for the first four to rise

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range