GC60-8 Hydraulic Crawler Excavator

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
60 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

GC60-8 Hydraulic Crawler Excavator’s Operating Weight is 5.85t, equipped with YANMAR 4TNV94L Engine, with Boom 3m, Arm 1.6m, Bucket 0.23m3, and Blade 1880mm×464mm.

GC60-8 Hydraulic Crawler Excavator

Technical Specifications

        Engine

    Travel System

Model

YANMAR 4TNV94L

Travel motors

JEIL, Korea; Variable axial piston motor

Type

Four-cylinder in line,

natural intake

Support roller quantities

2×5

Carrier roller quantities

2×1

No. of cylinder

4

Travel shoes

2×40

Bore and stroke

94mm×110mm

Travel speed

2.2/4.6km/h

Displacement

3.054L

Drawbar pulling force

46.5kN

Power output

35.5kW/2200rpm

Grade ability

58% (30°)

Ground clearance

360mm

      Hydraulic System

      Cab Control

Pump

Rexroth, Germany

Cab

All-weather, sound-suppressed Cab and equipped with a heavy, insulated Floor Mat; Front Window can be opened and slid; 6-direction adjustable Seat; LED display, Automatic monitoring, display and warning; cool & hot Air Conditioner

Type

variable double–piston pump

Max. discharge flow

138.6L/min

Max. discharge pressure

Boom, arm and bucket

22MPa

Control

Two hand levers and two foot pedals for travel Two hand levers for excavating and swing;

Electric rotary-type engine throttle

Travel circuit

22MPa

Swing circuit

21.5MPa

Control circuit

3MPa

Boom, Arm Bucket

Pilot control pump

Gear type

Boom cylinder

115mm×60mm×720mm

Main control valve

Negative flow control

Arm cylinder

90mm×60mm×877mm

Oil cooler

Air cooled type

Bucket cylinder

85mm×55mm×600mm

      Swing System

Refilling Capacitieslubrications

Swing motor

JEIL, Korea

Fuel tank

110L

Swing motor type

Axial-piston motor

Cooling system

10L

Brake

Hydraulic oil released

Engine oil

12L

Parking brake

Hydraulic disc brake

Hydraulic oil tank

90L  Tank oil level

Swing speed

10.4r/min

130L  Hydraulic system

                           Bucket

Type

Backhoe bucket

    Bucket capacity

0.23m3 (SAE)

Bucket width

705mm

Arm Type

A

Max. digging depth

5784mm

B

Max. dumping height

3986mm

C

Max. digging height

3858mm

D

Max. vertical digging depth

3786mm

E

Max. Depth cut for 2440m(8')Level Bottom

3449mm

F

Max. digging distance

6195mm

G

Max. digging radius at ground level

6062mm

H

Min. swing radius of work equipment

2392mm

Digging Force (ISO6015)        Unit: kN

Arm length

1600mm

Bucket digging force

39kN

Arm digging force

29.3kN

Arm Type                                 1600mm

A

Overall length

5851mm

I

Tread

1990mm

B

Ground contact length (Transportation)

3320mm

J

Track length

2569mm

C

Overall height(to top of boom)

1932mm

K

Track gauge

1480mm

D

Overall width

1880mm

L

Track width

1880mm

E

Overall height(to top of cab)

2621mm

M

Shoe width

400mm

F

Counter weight ground clearance

708mm

O

Bonnet height

1633mm

G

Ground clearance

360mm

P

Revolving frame width

1780mm

H

Tail swing radius

1655mm

Q

Distance from swivel center to tail

1655mm

             Operating Weight and Ground Pressure

Operating weight includes basic machine (with boom 3m, arm 1.6m, bucket 0.23m3, and blade 1880mm×464mm)

Shoe width

400mm

Overall width

1880mm

Ground pressure

33KPa

Operating weight

5850kg


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How does the excavator cross the ground cable?
This small shovel dug straight to the first line to get parallel, the size of the arm extension end, a bucket, then closed arm while walking, when the car over the line after the half, stretched from the push plate, to a certain height, the size of the arm to hold back the rotary body, the push plate back backward, too put off the line after the body on the line
Q:How long does it take to learn how to start an excavator? Do you learn it in two months?
Two months every day to open the school will certainly learn, some people guide faster, I do not know what you call the concept of making money
Q:What do you mean by excavator?
Excavators are used to dig holes, and network language means "pit"!
Q:What does the brand of each brand of the excavator mean?
Similarly, other brands of excavators in front of the letter on behalf of the manufacturer's excavator code,Komatsu "PC" for excavators, "WA" for loaders, "D" for bulldozers.Hitachi excavator codenamed "ZX", Doosan excavator codenamed "DH", Kobelco""SK", other brands of excavator models, the front letter is also the meaning of excavators.With the letters in front of you, then the numbers should be down, "320D" and "20"What do you mean? 20 represents the tonnage of the excavator, and the tonnage of the excavator is 20 tonsIn PC200-8, "200" means "20 ton", 215 for DH215LC-721.5 tons, and so on.320D is followed by the letter D which series of products, Caterpillar is now the latest DepartmentThe column should be the E range.
Q:What's the price of the CAT150 excavator?
Are you talking about new or second-hand, new almost 50W, second-hand, then you can go online www.sdcmm.cn to see their own reference
Q:Kato 450 excavator multiple
Kato 450 operating weight (kg):11600 (1) model: MITSUBISHI Mitsubishi 4D31T (2) bucket rod digging force (kN):53.9 (3) bucket digging force (kN):75.5 (4) origin: Japan (5) bucket capacity (square):0.22-0.55
Q:Dump trucks, earthmoving, shovel loading, vehicle distance from 48km, according to 2014 valuation quota,
.Five. For sprinkler (northern) 1-1-22 sprinkling water, filling water = filling volume * earth dry density * (optimum moisture content - natural moisture content) / (1+ natural water content).Six, fee, gasoline and diesel price, distance and other information according to the actual selection. Pay attention to the budget quota supplement, this is critical.Must have unit price, so give you count, dig, install 3.5 yuan + freight 48 yuan + rolling (sprinkler) 4 yuan, about 45.5 yuan /m3, without tax, management fees and so on.Also no matter what your site construction machinery, machinery is not allowed to swap quota, specifically to see the "interpretation" is not a detailed quota.Non professional, self-study. If there is any mistake, please correct me.
Q:The streets were wild and the ads said the excavator was carrying an oil hammer. What's the hammer?
The piston weighs from a few hundred kilograms to several tons.Use the hammer pile sinking hammer should be tapped. If the heavy hammer hits, the hammer work is absorbed by the pile body most, the pile is not easy to break in, and the pile head is easily broken. There is a certain ratio between the hammer weight and the pile weight, or the hammer stress is controlled to prevent the pile from being damaged.
Q:All the models and bucket capacity of Carter excavator
Baidu search "Caterpillar"The first one is its official websiteSelect product center"View excavator
Q:Method and steps of slope repair by excavator.
The slope (brush slope or pin slope) of an excavator usually refers to the sides of the road and riverbed. Trimming is generally required to be a smooth incline. It is difficult to repair the slope at the end of the forming slope. Are the points on a specified plane?. The slope (brush slope or pin slope) of an excavator usually refers to the sides of the road and riverbed. Trimming is generally required to be a smooth incline. It is difficult to repair the slope at the end of the forming slope. Are the points on a specified plane?. The general methods are facing the excavator slope, so the single from the cab is difficult to directly see, whether the slope is a flat surface, so the slope repair has been considered a high technical level and operation experience in the operation of excavator. Repair the slope, there are two cases, one is relatively easy, excavator from bottom to up, slope in embankment and riverbed above the earth. Before the start, the construction team will generally indicate the excavation line B and the excavation line a (following drawing), and this kind of slope is almost the same as the whole road. Only the road surface is horizontal.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range