Garage Roof Green Waterproof & Drainage Board

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
1000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

452x319  

Composite waterproof and drainage plate

Products overview:

Shandong yongrun composite waterproof and drainage of the floor board with high impact and the resistance, high pressure polystyrene (HIPS), HDPE resistant to high pressure for a long time, made no deformation. This long resistance not only can withstand bone-chilling concrete slabs and weight load, and can withstand bone-chilling during construction inevitable foreign pressure and impact, such as vehicles, workers and concrete pouring down momentum, etc. Long-term deformation, so keep floor can maintain the original displacement. On the floor of the filter layer is to ensure that the use of geotextiles drainage channels won't because foreign substance and block, such as particle or concrete backfill soil.

Product features:

Composite waterproof and drainage board set in an organic whole, waterproof and drainage success in solving the waterproof and drainage relations, no matter in drainage function, the economic interests are better than the traditional stone taoli drainage and other filter layer superior and reliable. Composite put drainage plate is the anti, drainage, and the combination of increase durability of engineering new products, its performance of 120 years of age. Building structure of waterproof and drainage is an important link is the durability, this to the building waterproof and drainage of the problem set new and higher requirements applying modern flexible waterproofing material building waterproof system, and in theory can completely impervious, but waterproof system often destroyed, in the environment will still produce leakage, composite waterproof and drainage plate to the part of the water discharge, the engineering for guidance and drainage, prevention in row, cut, plugging, and the combination of modern building waterproof and drainage system to the new requirements.

Application:

In the roof garden, outdoor garage roof greening, retaining wall, the basement, metro, underground foundation engineering, slope protection and a highway roadbed of waterproof and drainage, wide application.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How does the waterproofing membrane work?
2, in accordance with the roof slope in the direction of the parallel roof will be placed in the waterproof membrane, and unwound;
Q:Slope roof drains do not need to be waterproof
need. Roof waterproof layer regardless of which form and materials, constitute the entire roof of the waterproof drainage system, all the necessary pipes, flues, drainage holes, embedded iron and pillars and other roof out of the facilities, should be done in the roof waterproof Layer to properly handle the structure of the node, with particular attention to the connection part of the soil and the drain part of the water flow.
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
How to deal with the roof leakage, the roof leaks to find the first leak, looking for the main leak from the roof to the lower to find leakage. The first is to see if there is no cracks in the roof, the original waterproof layer is not aging, the roof of the original SBS waterproofing membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking. There is a block on the roof of the gutter is not blocked in the countryside, there are still a large number of tile-roofed house, when the tiles due to damage caused by the roof leakage, as long as the replacement of tiles can be, this step is also known as "
Q:Eastern rainbow waterproof how to do
Do not know where you use, waterproof as if a lot of materials. I know there are coiled, painted.
Q:Developers have done waterproof, decoration house also have to do it
Secondly, before the waterproof layer may be done in the house decoration, paving tiles or other equipment when the installation was destroyed, so that the waterproof layer is no longer a whole,
Q:Cabinet is to buy finished products, or directly to the decoration company to do?
My home decoration cabinets are Haotian decorative package to do, although expensive, but still very worthwhile, all of their wood will be waterproof and moisture, in contact with the wall will do the underground waterproof and moisture, and are on-site cash Now do, timber materials can be seen directly, the amount of glue is not much, less formaldehyde, the latter part of the living is also more comfortable!
Q:What decoration materials, light and water, and the wall, the perfect combination of glass
Second, cover the surrounding surface With the tape or the US profile of paper to cover the surface of the interface surface, according to the width of the gap to keep the gap width, width uniformity to ensure that the sealing of the work lines neat and perfect;
Q:Finished house bathroom waterproof household acceptance should be how to accept?
5: the use of construction stubs should be along the direction of the flow of water, lap width of not less than 100mm, the use of two or more fiberglass cloth up and down when the overlap should be staggered width of one-half.
Q:What is PE waterproof cloth and PVC tarpaulin
PE tarpaulin, anti-aging, anti-aging, anti-corrosion, light, easy to fold, relative to the PVC tarpaulin, PE tarpaulin cheaper price for the freight yard, the service life will be shorter.
Q:A complete set of basement waterproof construction program
Second, the basement of the external walls of water leakage construction preparation 2.1 Technical preparation 2.1.1 Selection of construction methods Waterproof engineering is related to the use of the project an important indicator, it is the construction process of a key project, difficult engineering. The choice of construction methods and programs has a direct impact on the quality of construction. The underground wall of the project SBS waterproofing membrane with hot melt method full construction. 2.1.2 before the start of the project, the first organization of engineering and technical personnel to enter the construction site, to understand the situation, to further understand the characteristics of the project to solve the contradiction between the construction technology and the implementation process. 2.1.3 technology before the end of the construction of waterproofing works by the professional foreman in accordance with the construction drawings and the existing national norms require the actual situation of the project to the construction team in writing to the end. The contents include construction site, construction sequence, construction technology, construction level, node fortification method, enhancement site and practice, project quality standard, guarantee the quality of technical measures. And after the field technical person in charge of the strict implementation of the audit.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range