Galvanized Steel Profile/100 Stud for Dry Wall

Ref Price:
$0.10 - 0.80 / m²
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
10000 m²
Supply Capability:
300000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Interior partition wall or veneering wall of hotels, theaters, emporiums, factories, office, house, airplane-terminal buildings, bus stations, waiting lounge, etc.

Product Applications:


1.Indoor ceiling of industrial and resident building.

2.Partition of industrial and resident building.

3.The partition of the bathroom and other wet condition building.

4.Indoor partition as base board of the decoration for operation room,clean room of hospital or laboratory .

5.The fireproof board of the air passage.


Product Advantages:


1.Light,good strength,cauterization resistance and water resistance;

2.Matching magnesium fire-proof board,gypsum board,and many other wall and ceiling board;

3.Moisture -proof,shock-resistance,high-effecient,environmentally-friendly and so on;

4.Easy and fast for installation,time-saving;

5.prompt delivery,high quality,competitive price and complete sets of style;

6.We can supply you the products based on your specific requirements;


Main Product Features:


metal drywall system galvanized steel profile c channel

Our drywall studs are made of galvanized steel sheet with good rust-proof function. The thickness is strictly according to the international demand.


Product Specifications:

Galvanized Steel Profile/100 Stud for Dry Wall




FAQ:


1:.How can I get your prompt quotation?

A: we can give you reply with quotation quickly if you kindly send the inquiry with  specification.

 2.What's the MOQ of the order?
No limit, we can offer the best suggestions and solutions according to your condition.

 3. Which payment terms can you accept?
T/T,LC,Western Union,moneygram are available for us.

 4. After an order is placed, when to deliver?
15-25days after confirming the order.

5. Does your company accept customization?
We accept OEM service.

6. How to solve the quality problems?
If the products don’t conform to customer’s samples or have quality problems, our company will be responsible to make compensation for it based on enough evidence.


Images:


Galvanized Steel Profile/100 Stud for Dry Wall

Galvanized Steel Profile/100 Stud for Dry Wall

Galvanized Steel Profile/100 Stud for Dry Wall

Galvanized Steel Profile/100 Stud for Dry Wall

Galvanized Steel Profile/100 Stud for Dry Wall

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Curved gypsum board wall technology.
If the curvature is not large, then the gypsum board can be bent directly over, the deformation of the gypsum board itself is enough, if the curvature is too large, then only cut the stitching, and then patch repair, no matter what method, Do not use anything evenly spray water and then bend into the arc, gypsum board wet water, the intensity is very low, although dry, the strength and good board is not very different, but there may be deformation of the plate
Q:Who used the light steel keel gypsum board to do the wall?
The sound insulation effect than the brick or a little worse but have their own advantages and disadvantages of the small space that is also cheaper than the brick wall is suitable for wardrobe compartment
Q:Gypsum board partition wall how to sound insulation
Single-walled wall due to the law of quality constraints, must be a heavy wall in order to obtain good sound insulation performance. For the office partition wall, in order to meet the national minimum standard rw = 40db requirements of single-layer partition at least 100kgm2 above the surface density (surface density is the weight per square meter of the wall). If the wall is divided into two or more layers, the sound insulation will be significantly improved.
Q:Can the interior walls be made of light steel keel partitions? Bathroom wall and interior wall with light steel keel wall is good or brick wall good?
Light steel keel wall moisture resistance is poor, even with glass magnesium board, Ette board and other moisture-proof sheet, but still not suitable for high water requirements of the bathroom, there will be hidden.
Q:Lightweight wallboard light steel keel how to construction
Light ends of the keel should be installed firmly, keel and the base of the fixed point spacing should not be greater than one meter, installed through the series keel, less than three meters of the partition to install a three to five meters installed two When the transverse joints are not on the edge, along the top keel, should be added to the dragon keel fixed, doors and windows or special joints to install additional keel should meet the design requirements of the skeleton wall in the installation of decorative panels should check the firmness of the skeleton , Whether the installation of wall equipment, pipeline and filling materials meet the design requirements If there is a non-compliance should take measures. Light wall panels The installation process as long as the step by step, the order of work also need to be more cautious.
Q:Has installed a wooden floor, you can do in the above light steel keel wall?
My advice is not to do on wooden flooring Because the wood floor is flexible. The The It is best to finish the wall, and then restore the floor Just personal opinion for reference only
Q:Light steel keel gypsum board partition wall brush black latex paint, I would like to change the brush blue latex paint, how to deal with grassroots?
Can ah, the paper gypsum board above also scraping putty ah, the workers will deal with, you just ask the request on it, professional things professional do
Q:Light steel keel wall to remove the price
General demolition is to ask the workers, the price of workers depends on the local price, should be the price of each place are different, hope to have a role in you.
Q:Gypsum board wall above the good paint glass?
Gypsum board partition wall construction operation process: (1) According to the design drawings, in the already done walls, floors, the ground release off the line, the door hole edge. (2) according to the design drawings and the actual size, with a wheel cutting machine cutting keel and classified stacking. (3) according to the line has been put away and the door edge, with nails or expansion bolts to the ground keel fixed on the ground floor, nail or expansion bolt spacing 600mm. The top of the keel into the wall of the reserved hole 100mm, and then use cement mortar packing fixed, or with nails, expansion bolts to the end of the handle along the top keel fixed to the wall. (4) According to the cut line and the edge of the door, according to the size of the file size layout, painted in the edge, along the top keel, less than the modulus should be placed in the partition with the wall at the first board. (5) According to the document mark will be cut in advance of the length of the vertical keel in turn inserted along the edge, along the top keel groove, the flange towards the direction of the proposed panel to be installed. Adjust the vertical, positioning accuracy, with rivets fixed. The vertical keel on the wall is fixed to the wall with a nail or expansion bolt, and the distance between the nail or the expansion bolt is 1m. (6) the installation of doors and windows to strengthen the installation of the keel: the first installation of the hole on both sides of the vertical reinforcement keel, and then install the hole up and down to strengthen the keel, and finally install the big hole on both sides of the upper and lower reinforcement keel and bracing. (7) Install the cross brace and support card. The vertical keel fastened, so that the entire partition keel has sufficient strength and stiffness.
Q:Light steel keel gypsum board partition wall construction practices and construction process What is the difference?
The practice is to first play on the ground and shed on the corner keel must be vertical after the installation of the main keel times the keel installed in the plaster board plaster brush latex paint difference is stronger than the keel cost is higher than the wood keel

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range