Galvanized Steel Plank with perforated design for Scaffold CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: RS-SP

  • Type: Scaffolding Parts, With hook for round tube or U profile

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Steel

  • Surface: Paint/galvanized or to be ordered

  • Loading Capacity: 500kg

  • Standard: EN 12811

Galvanized Steel Plank with perforated design for Scaffold CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model No: FAS-AP

Model Name: Scaffolding System-Aluminium Platform

4.Features:
1) Dimensions (Lx W ): 2570x610mm, 3070x610mm,
2) Made of Aluminum channel and sheet
3) Used in facade scaffold systems
4) Surface: Aluminum oxygenation

5) With hook for tube and u-profile

5.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the measures in the rainy season? What precautions must be done?
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q:What is the distance from the external walls of the scaffolding and scaffolding?
Under normal circumstances, horizontal horizontal bar extension does not exceed 300mm
Q:Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
How is offshore oil mining?The method of lifting the oil from the bottom of the hole to the ground by the energy of the reservoir itself or by the artificial supply
Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q:How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q:Can the fifteen typhoon blow up the three - storey house?
Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:How long do you have to wait before you can take a scaffolding piercing out for short periods of time?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:2 painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N.?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:How to do a good job in typhoon prevention work in rural areas?
Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range