Galvanized Steel Kwikstage Scaffolding System Comply with AS/NZ Standard CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Galvanized Steel Kwikstage Scaffolding System Comply with AS/NZ Standard
Type:
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Place of Origin:
Surface:
Material.:
Thickness:
Descriptions of Galvanized Steel Kwikstage Scaffolding System Comply with AS/NZ Standard
Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.
The Accessories of Galvanized Steel Kwikstage Scaffolding System Comply with AS/NZ Standard
STEEL STANDARD
Material: steel tube φ48.3x3.25mm
Surface finish: hot dipped galvanized
Standard with normal length 3.0m, 17.02kg
Standard with normal length 2.5m, 14.32kg
Standard with normal length 2.0m, 11.64kg
Standard with normal length 1.5m, 8.94kg
Standard with normal length 1.0m, 6.26kg
Standard with normal length 0.5m, 3.56kg
Topper Standard, 1.72kg
Material: steel tube φ48.3x4.0mm
Surface finish: hot dipped galvanized
Standard with normal length 3.0m, 19.48kg
Standard with normal length 2.5m, 16.38kg
Standard with normal length 2.0m, 13.28kg
Standard with normal length 1.5m, 10.18kg
Standard with normal length 1.0m, 7.07kg
Standard with normal length 0.5m, 3.97kg
Topper Standard, 1.93kg
STEEL LEDGER
Material: Made of steel tube φ48.3x3.25mm
Surface: hot dipped galvanized
Ledger of 3.00m, 13.00kg
Ledger of 2.44m, 10.67kg
Ledger of 2.39m, 10.60kg
Ledger of 1.95m, 8.87kg
Ledger of 1.83m, 8.29kg
Ledger of 1.78m, 8.20kg
Ledger of 1.47m, 6.97kg
Ledger of 1.22m, 5.98kg
Ledger of 1.05m, 5.31kg
Ledger of 0.71m, 3.97kg
TRANSOM (ANGLE)
Material: Made of steel 5# angle
Surface: hot dipped galvanized
Transom 2.39m, 17.71kg
Transom 1.78m, 13.60kg
Transom 1.27m, 10.19kg
Transom 1.22m, 9.85kg
Transom 1.05m, 8.70kg
Transom 0.813m, 7.12kg
Transom 0.71m, 6.42kg
Transom 0.60m, 5.75kg
Transom 0.51m, 5.08kg
L/A Transom 1.8m, 11.78kg
L/A Transom 1.2m, 9.56kg
BRACE
Material: Made of steel tube φ48.3x3.25mm
Surface: hot dipped galvanized
Brace 3.6m, 15.33kg
Brace 3.2m, 14.00kg
Brace 2.7m, 12.25kg
Brace 2.0m, 9.33kg
Brace 1.6m, 7.99kg
STEEL PLANK
Material: Made of 1.8mm thickness pre-gal.steel sheet
Surface: hot dipped galvanized
Size: 229mm(W)x 66mm(H)
Steel Plank 4.00m, 25.30kg
Steel Plank 3.00m, 18.90kg
Steel Plank 2.44m, 15.37kg
Steel Plank 2.00m, 12.52kg
Steel Plank 1.81m, 11.42kg
Steel Plank 1.25m, 8.20kg
Steel Plank 1.05m, 7.05kg
Steel Plank 0.736m, 5.25kg
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q:A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
- First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
- Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
- Mobile scaffolding in general are on the basis of rent by the day
- Q:Specification and type of scaffold erection
- Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
- Q:Can you do the outer scaffolding?
- (2) the outer side of the scaffold must be provided with scissors, scissors width should not be less than 4 span, and should not be less than 6m, the angle between the diagonal rod and the ground is 45-60 degrees. The intersection points of the oblique bars are on the same straight line and are arranged along the height of the frame. (3) a diagonal rod of the scissors is buckled on the upright post, and the other inclined rod is buckled on the end of the small transverse rod, and the two ends are respectively fixed with a rotating fastener. All fixed pitch master node distance not greater than 15 cm
- Q:What are the dangers of scaffolding
- (5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
- Q:The basic form of external scaffolding
- The bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The bowl buckle joint is the core component of the scaffold system, which consists of the upper bowl buckle, the lower bowl buckle, the cross bar joint and the limit pin on the upper bowl buckle.
- Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
- Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
- Q:what is the height of a scaffold if the person is 6ft tall?
- Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
- Q:On Wednesday day I'm planning to get this done (the top piercing). I've been thinking about it for a while now really want it.What problems can I have with this piercing?How long does it take to heal ect?Thanks =)
- i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
- Q:What are the requirements for the sampling inspection of scaffolding?
- Quality specification for the cantilever support1 the material of the suspension bearing frame should have the certificate of quality and quality inspection report;2 the height and length of the weld shall meet the design requirements, and shall not have any defects such as welding cracks, structural deformation, corrosion and so on;3 the production quality of the suspension frame shall be in conformity with the provisions of appendix D table D.1.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Galvanized Steel Kwikstage Scaffolding System Comply with AS/NZ Standard CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords