Galvanized Standard of Cuplock System Scaffolding

Ref Price:
$15.00 / set
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 set
Supply Capability:
2000000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Struture of Galvanized Cuplock Standard

What is Cuplock Scaffolding system  ?

Cuplock  Scaffolding system  is also called Modular Scaffolding and Multidirectional   Scaffolding, the junction enables quick and easy connection of load  bearing items as well as reinforcing parts to each other with an enormous rigidity. Galvanized Cuplock Standard is a tube of D48*3.5mm which material is Q235/Q345B,  Ledger is made by a tube with two cup welded on the ends separatel


Function of the Cuplock  Scaffolding system 

 Cuplock  scaffolding is the new generation product of  sacffolding.. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many cups every specific distance used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two blade welded on the ends separately


Advantage of Cinglock Scaffolding system 

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main Features of  Galvanized Cuplock Standard

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.  images of Galvanized Cuplock Standard

Galvanized Standard of Cuplock System Scaffolding

Galvanized Standard of Cuplock System Scaffolding

 

4.  Specification of Galvanized Cuplock Standard

Raw Material: Q345

Size: 500-3000 mm or customer demanded 

Certifies:, Element

Technology : Forging  / welding 

Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

Brand Name:FF

Useage: connecting the scaffolding pipe

OEM service offered

 

5.FAQ of Galvanized Cuplock Standard

Why you choose us?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

   Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

   Our firm belief that our customer's success are the only guarantee of our success .
 

Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the functions and requirements of the masonry wall
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
Q:Little help on Industrial/Scaffold Piercings?
I think industrials look extremely sexy on guys! I have one in each ear, and they cost 75 each ask to get it pierced with a smaller gauge, they usually pierce with 14g and it looks too big on most people and is more likely to bubble over. Im a girl so this wont be a problem for you, long hair really sucks with these piercings so I suggest pinning it back. Get the ear pierced that you are less likely to sleep on, getting it pulled on while you sleep really agitated the piercing. Keep it clean, use medicated or anti bacterial soap at least five times a day. clean it with qtips. uhm that's all I can think of right now. Best of Luck!
Q:How long after getting an industrial/scaffold ear piercing does it stop hurting?
go the the dr or you piercer
Q:Erection of scaffolding accessories
When the scaffolding height of more than 20m, should be in the scaffolding outside every 4 steps to set a level of reinforcement bar, and even walls should be in a horizontal layer set pieces; set of longitudinal reinforcement bars should be continuous, and the formation of the level of closed loop; on the bottom step lower door frame scaffolding should be sealed in the mouth bar, door frame and should be located on both sides of long rod should adopt sweeping bar; fastener rack pole fastened by. Construction should pay attention to the door frame and accessories should not be mixed with the same hand rack.
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
difficult situation. search in google or bing. that could actually help!
Q:opinions on scaffolding piercing and how to hide it from school :)?
While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
Q:Specification and type of scaffold erection
2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
Q:Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range