Galvanized Ringlock System Scaffolding Ledger

Ref Price:
$20.00 / pc
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Galvanized Ringlock System Scaffolding Ledger

Ringlock scaffolding system is a modular scaffolding system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance. ringlock scaffolding system is widely used in platform, bridge, construction, buildings,and so on.

 

2.Main Features of Galvanized Ringlock System Scaffolding Ledger

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3. Galvanized Ringlock System Scaffolding Ledger images 

Galvanized Ringlock System Scaffolding Ledger

 

Galvanized Ringlock System Scaffolding Ledger

4.Galvanized Ringlock System Scaffolding Ledger Specification

 Raw Material: Q345

 Size: 500-3000 mm or customer demanded 

 Certifies:, Element

 Technology : Forging  / welding 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered

 

5.FAQ of Galvanized Ringlock System Scaffolding Ledger

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 

Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


 

Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:As Hester once did, what time of day did Dimmesdale attend the Scaffold, and what compels his action?
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:Cantilever scaffold technical disclosure
The surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scarring, delamination, dislocation, hard bending, burrs, indentation and deep drawing.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.
Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:seriously i need help with my scaffold piercing please !?
carefully clean the fresh blood off then leave it alone after that - dont keep removing the dry blood - then clean it with saline solution/salt water and antibacterial stuff
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:Scaffolding????
Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
Q:Targus or scaffold piercing?
If you want to be different AND have something that looks really cute, get a micro dermal. Either on your collar bone, or lower back dimples if you have cute ones! Good luck hun!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range