Galvanized Profiles for Dry Wall Galvanized Profiles for Dry Wall

Ref Price:
$0.15 - 0.80 / m²
Loading Port:
Payment Terms:
TT or LC
Min Order Qty:
10000 m²
Supply Capability:
300000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Interior partition wall or veneering wall of hotels, theaters, emporiums, factories, office, house, airplane-terminal buildings, bus stations, waiting lounge, etc.

Product Applications:

1.Indoor ceiling of industrial and resident building.

2.Partition of industrial and resident building.

3.The partition of the bathroom and other wet condition building.

4.Indoor partition as base board of the decoration for operation room,clean room of hospital or laboratory .

5.The fireproof board of the air passage.

Product Advantages:

1.Light,good strength,cauterization resistance and water resistance;

2.Matching magnesium fire-proof board,gypsum board,and many other wall and ceiling board;

3.Moisture -proof,shock-resistance,high-effecient,environmentally-friendly and so on;

4.Easy and fast for installation,time-saving;

5.prompt delivery,high quality,competitive price and complete sets of style;

6.We can supply you the products based on your specific requirements;

Main Product Features:




Product Specifications:

Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall


1:.How can I get your prompt quotation?

A: we can give you reply with quotation quickly if you kindly send the inquiry with  specification.

 2.What's the MOQ of the order?
No limit, we can offer the best suggestions and solutions according to your condition.

 3. Which payment terms can you accept?
T/T,LC,Western Union,moneygram are available for us.

 4. After an order is placed, when to deliver?
15-25days after confirming the order.

5. Does your company accept customization?
We accept OEM service.

6. How to solve the quality problems?
If the products don’t conform to customer’s samples or have quality problems, our company will be responsible to make compensation for it based on enough evidence.


 Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall

Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall

Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall

Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall

Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall

Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall

Galvanized Profiles for Dry Wall Galvanized Profiles   for Dry Wall

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Gypsum board wall above the good paint glass?
Gypsum board partition wall construction operation process: (1) According to the design drawings, in the already done walls, floors, the ground release off the line, the door hole edge. (2) according to the design drawings and the actual size, with a wheel cutting machine cutting keel and classified stacking. (3) according to the line has been put away and the door edge, with nails or expansion bolts to the ground keel fixed on the ground floor, nail or expansion bolt spacing 600mm. The top of the keel into the wall of the reserved hole 100mm, and then use cement mortar packing fixed, or with nails, expansion bolts to the end of the handle along the top keel fixed to the wall. (4) According to the cut line and the edge of the door, according to the size of the file size layout, painted in the edge, along the top keel, less than the modulus should be placed in the partition with the wall at the first board. (5) According to the document mark will be cut in advance of the length of the vertical keel in turn inserted along the edge, along the top keel groove, the flange towards the direction of the proposed panel to be installed. Adjust the vertical, positioning accuracy, with rivets fixed. The vertical keel on the wall is fixed to the wall with a nail or expansion bolt, and the distance between the nail or the expansion bolt is 1m. (6) the installation of doors and windows to strengthen the installation of the keel: the first installation of the hole on both sides of the vertical reinforcement keel, and then install the hole up and down to strengthen the keel, and finally install the big hole on both sides of the upper and lower reinforcement keel and bracing. (7) Install the cross brace and support card. The vertical keel fastened, so that the entire partition keel has sufficient strength and stiffness.
Q:Light steel keel partition wall construction process is what
(1) Pin line, sub-file: in the partition with the upper and lower and the two sides of the matrix at the junction, should be the width of the keel line. Battle clear, accurate location. According to the design requirements, combined with the cover panel of the long and wide sub-file to determine the vertical keel; transverse and additional keel position. (2) for the pillow: when the design requirements, according to the design requirements for the concrete pillow. For the pillow should be supporting mold, bean stone concrete should be pound dense. (3) fixed along the edge, along the keel; along the line position fixed along the edge, along the keel, can be fixed with nails or expansion bolts, fixed point spacing should not be greater than 600mm, keel docking should remain straight.
Q:Light steel keel wall waterproof
Used to resist external UV radiation, natural aging and chemical corrosion, effectively extend the coating use
Q:Light steel keel gypsum board partition wall brush black latex paint, I would like to change the brush blue latex paint, how to deal with grassroots?
First with glue all roller brush again, and then approved once again talcum putty (as in the north with a double powder, that is, "white"), sand polish after leveling, you can roll the new latex paint. There is a need for a patch on the wall, just at the same time.
Q:Light steel keel partition wall fire retardant coating shabu several surface
Brush when, in accordance with the requirements, at least need to brush twice. Although the Tai Po people in practice only brush it again, but suggest that you still brush twice for safety.
Q:What kind of new material is now called a "light partition" in the house? Is it safe?
Light steel keel inorganic composite wall wall thickness of only about 175px, compared to the ordinary wall of about 300px, thin wall more space to save space, the estimated 110 square meters of the room, the use of light steel keel inorganic composite board Wall, can save about 1.6 square meters of space, so that the house to maximize the use of more spacious and comfortable space.
Q:On the decoration of the partition and the floor of the problem?
With the filling block wall, and the same brick with the nail what is no problem, the weight is not heavy, the thinnest filling block is 120 thick, even the total thickness of double-sided plaster does not exceed 180, or light The partition wall is also the line, faster, but also durable, more than gypsum board wall to spend more, but at least the first nibbling nails are no problem, more durable and reliable, the weight is also light, the normal stay on the trip.
Q:9 + 9 double gypsum board is what it means
Is the two layers of 9mm gypsum board superimposed practice (in fact, the standard thickness of the gypsum board should be 9.5mm), which in the light steel keel wall design, is more common. It is more than a single layer of gypsum board in the crack to avoid the problem, to be much more insurance.
Q:100 light steel keel 9.5mm thick gypsum board double double-sided partition three times, three times latex paint.
The following is the decomposition of the material (no loss), vertical wall keel spacing is generally @ 400, vertical keel is 2.5m / m2; along the top edge (heaven and earth) keel is 2/3 = 0.67m / m2; Piercing board is 4m2 / m2 partition wall area; large white putty is about 2.5kg / m2 partition wall area, latex paint is 0.5kg / m2 partition wall area. Brush twice to consider; the rest Is the card pieces, nails, bandages, white latex, high-strength nails and oblique support cable-stayed material (wood can be) and other auxiliary materials Usually the wall should also have rock wool, 50 thick or 75 thick
Q:Decoration decoration works Light steel keel wall, layer 4 meters high thickness What are the requirements? There is no specific specification?
Save material, reduce human input The use of the fixed screw of the keel and the angle of the fixed support column are used as the reinforcement of the ridge of the ridge, which changes the traditional construction method of embedding steel and fixed expansion bolts in the ridge, saving the material and reducing the manpower Of the input.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range