• Galvanized Cuplock  System Scaffolding Ledger  for Construction System 1
  • Galvanized Cuplock  System Scaffolding Ledger  for Construction System 2
  • Galvanized Cuplock  System Scaffolding Ledger  for Construction System 3
  • Galvanized Cuplock  System Scaffolding Ledger  for Construction System 4
  • Galvanized Cuplock  System Scaffolding Ledger  for Construction System 5
  • Galvanized Cuplock  System Scaffolding Ledger  for Construction System 6
Galvanized Cuplock  System Scaffolding Ledger  for Construction

Galvanized Cuplock System Scaffolding Ledger for Construction

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

1. Galvanized Cuplock  System Scaffolding Ledger  for Construction

What is Cuplock Scaffolding system  ?

Cuplock  Scaffolding system  is also called Modular Scaffolding and Multidirectional   Scaffolding, the junction enables quick and easy connection of load  bearing items as well as reinforcing parts to each other with an enormous rigidity. Galvanized Cuplock System Scaffolding Standard for Constructionis a tube of D48*3.5mm which material is Q235/Q345B,  Galvanized Cuplock  System Scaffolding Ledger  for Construction is made by a tube with two cup welded on the ends separatel


Function of the Cuplock  Scaffolding system 

 Cuplock  scaffolding is the new generation product of  sacffolding.. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many cups every specific distance used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two blade welded on the ends separately


Advantage of Cuplock Scaffolding system 

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main Features of Galvanized Cuplock  System Scaffolding Ledger  for Construction

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.   Galvanized Cuplock  System Scaffolding Ledger  for Construction  Image

Galvanized Cuplock  System Scaffolding Ledger  for Construction

Galvanized Cuplock  System Scaffolding Ledger  for Construction

Galvanized Cuplock  System Scaffolding Ledger  for Construction


4.  Galvanized Cuplock System Scaffolding Ledger  for Construction Specification

 Raw Material: Q345

 Size: 500-3000 mm or customer demanded 

 Certifies:, Element

 Technology : Forging  / welding 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Galvanized Cuplock System Scaffolding Ledger  for Construction

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 

Scaffolding refers to the construction site for workers operation and solve the vertical and horizontal transportation and erection of all kinds of support.Architecture of the generic term, refers to the construction site in exterior, interior, or higher storey height can't construction directly.Mainly for construction personnel and operation safety net or periphery palisade and high altitude installation components, etc., to put it bluntly, is which scaffolding materials usually have: bamboo, wood, steel or synthetic materials.Some works also use scaffolding when the template is used, in addition in the advertising industry, municipal, transportation luqiao, mining and other departments is also widely used.Engineering construction to choose different USES of the same type of scaffolding and formwork.Bridge support rack bowl of scaffold, has used the door scaffolding.The main structure of scaffold for construction land use fastener scaffold, scaffolding poling of the longitudinal spacing generally 1.2 ~ 1.8 m;Horizontal distance average of 0.9 ~ 1.5 m.



Q:A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q:i got my scaffold done quite a while ago and it still really hurts and is all lush and crusty,loli know it takes agessss to heal but could i take it out and put normall small earrings in each whole instead? Which would i have to use? thanks
in my opinion you should ride it out and just clean it more often. not only will the piercings give you trouble if you try to change the earring now, the piercings themselves will move slightly and you won't be able to put an industrial bar back through it. if you can live with these go through with it, if not, wash often, rotate the bar constantly and avoid sleeping on it and getting your hair caught up in it. like you said, piercings in the cartilage are very sensitive and need time and nurturing so that they can heal properly.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
It recommends tea tree oil, or vitamin E oil applied directly to the area.
Q:I'm trying to understand a problem in my physics book. The problem is this:A person is pulling on a rope, that is connected to a pulley on the ceiling. The rope then goes to a box with a pulley on it, and then up to the ceiling where the rope is connected (to the ceiling).The rope and pulleys are massless and frictionless.The book lists three forces (tension forces) going up and one weight force pulling down.My question is, why isn't there another force pulling against the tension of the rope from the guy pulling the rope?
The force felt by the person pulling is the same as the force in the rope between the two pulleys. It doesn't matter if the person is pulling straight up (without the pulley) or straight down(with the pulley) it's the same. Therefore the weight/force is divided equally between the two ropes.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
Q:What does Scaffolding mean in the educational talk?
Scaffolding is the support the teacher provides to lead the student to learn the necessary skill. In a classroom discussion on a literary text, the teacher might scaffold learners by starting questions with concrete answers (found in the text) then asking guiding questions which require more abstract thought (for instance, asking students to make inferences). In other instances, if a concept or skill is too difficult for a student, the teacher may choose to reteach an earlier skill, then provide one-on-one tutoring on the new skill until the student gets it. There are other ways to scaffold. Some students may only need the support of a peer-partner to reach success. Others may need a change in environment (move to a quieter place to work) or a change in material (providing colored transparencies for a dyslexic student during silent reading). Scaffolding is a form of targeted, differentiated support. What you will find over time is that the techniques you use actually serve more than just the intended audience. I have found that scaffolding during classroom discourse helps not just the obviously struggling student, but those who were reluctant to raise their hands or otherwise let me know that they were struggling, too.
Q:The construction scheme of high rise and external cantilever scaffold!
Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords