Galvanized Cuplock Scaffold from wholesale China factory

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Galvanized Cuplock Scaffold from wholesale China factory


Quick Details

Place of Origin:

Shandong China (Mainland)

Brand Name:

HILONG

Model Number:

HL

Size::

48.3*3.25mm

Material::

Steel (Q235/Q345)

Surface::

Electro Galvanized/Self Color/Painted/HDG

Category::

Scaffolding system

Component::

Standard, Ledger, Diagonal, Bracket, Top&Bottom cup, Ledger blade etc

Advantage::

Durable,Stable,Skid-proof,Antirust,Easy to assembleandDismantle

Service:

OEM, custom-made

Application:

Highways,Subways,Slab support,staircasecal

Delivery Time:

15-25 days after deposit

Package:

Bulk, Steel Pallet, Crate, Ton Bags, or as your requests






Packaging & Delivery

Packaging Detail:

Bulk, Steel Pallet, Crate, Ton Bags, or as your requests

Delivery Detail:

20 days


Specifications

1.OEM Service, internantional standards 
2.competitive price,fast delivery,good service 
3.over ten-years experience 
4.sample


Galvanized Cuplock Scaffold from wholesale China factory

Galvanized Cuplock Scaffold from wholesale China factory

Galvanized Cuplock Scaffold from wholesale China factory


FAQ

1) What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.

    We can provide you the professional design team.

    We can provide fashionable and newest styles for you.

    We can design the artwork for you.

    Please feel free to customize.

 

2) What promises can be done by us?

    If interested in Aluminum-Frame Formwork, please feel free to write us for any QUOTE.

    If printing required, please advise asap because the whole set need much more time to complete.

    Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

    Response will be carried out in 24hours  after receiving any complain or request.

    Aluminum-Frame Formwork cost can be refund after order is confirmed.

    If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers,

such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. By air/ sea, and we are VIP of these express.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How much is the price of the bowl buckle scaffold
The average price of 150 yuan / ton / month, bowl buckle scaffolding rental costs of -3 minutes / M / day, different regions, different prices.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:my scaffolding piercing.. read more?
WTF is a scaffolding? If it's what I hope it is you should poast a link to a pic of it....
Q:Can Scaffold piercings be done as separate holes?
They can be done as two separate piercings, and it is up to the piercer and the shape of your ear to decide if something like that will be done. However, I would not recommend it, because even if it is partially healed, putting two separate earrings in can still misalign the piercing when you go to put the bar back in later. I would recommend keeping the bar in, it's a guaranteed way to make your piercing work out. Besides, once you get used to the bar, you won't even know you have it in! Much easier than keeping track of two separate earrings and making sure they still align months down the road. As for the angle, it depends on your preference and what is able to be done due to the shape of your ear. Some people want theirs straight across, others want a much steeper angle. It all depends on preference and shape of ear. Hope this helps, good luck!
Q:What is your opinion on the scaffold match?
It is an incredibly dangerous match, but that's what makes it such a spectacle. It's almost the same as watching a tightrope walker or trapeze artist at the circus, because there's always that danger of suffering a life-threatening fall if just one coordinated move goes wrong. Go back and watch NWA Starrcade '86 and watch the Skywalker's Match between the Road Warriors and the Rock 'n' Roll Express. Still makes me antsy to this day.
Q:Difference between scaffold and industrial piercings?
From what I've seen what the piercing is called varies from country - in the US/Canada I've heard most people call it an industrial, and the people that have called it scaffold are typically from the UK.
Q:Could you use scaffolding boards for floorboards?
No reason other than scaffolding planks are way thicker than floorboards would be, thats all. If you've got a supply of them, you may as well use them, but they will be harder to fit. if they're going on top of joists, then the finished height will be above door clearances, too
Q:Bridge template support bowl button steel scaffolding, you need to set the sweeping rod
Bridge formwork support bowl buckle type steel pipe scaffold, need to set the sweeping rod.
Q:How to calculate the amount of steel tube in the template system of the bowl buckle scaffold?
To determine the spacing between the poles, but these are theoretical things. In fact, the general use of 1200 or 900 of the space. According to the size of the room layout on the line
Q:in the safety scaffolding?
If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range