FZQ1650 tower crane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

FZQ series anchorage luffing-jib tower crane is a sort of large crane applicable for thermal power, hydropower, nuclear power, petroleum, chemical industry, metallurgy, high-rise steel structure and other erection of large-scale construction projects, especially suitable for tower boiler lifting in power station and construction of tall buildings at narrow site.
To meet the requirements in different operating conditions, FZQ series tower crane has been successfully developed such as FZQ1380, FZQ1650, FZQ2200, FZQ2520. This series of products adopt advanced production technology and design concept featuring in high technology content and excellent performance, which keeps pace with international advanced level, and has gained tens of China national patent technology.
The pedestal of this series crane adopts box-type structure resulting in non-concrete foundation, which reduces the foundation treatment cost.
This series tower crane adopts advanced anchoring method and structure that the anchoring location can be flexibly adjusted to a wide application range.
The connection of tower section adopts “HALF” quick-type structure, which simplifies assemble and disassemble process. The standard section and anchoring section can be interchangeable owing to the same geometry dimension.
Boom system is manufactured of fine-grained ultra-high strength alloy steel pipe with significant reduction in weight; the mast is made of high-strength low-alloy steel pipe that provides the crane with compact structure and strong lifting capacity.

The hoisting mechanism adopts international renowned brand gearbox and Lebus drum, which guarantees its good performance; the electric control introduces full frequency conversion to realize fast, stable and non-impact operation.

The crane is equipped with complete safeguard devices to realize multi-protection for safe operation.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to install the jack up tower crane 30How to install the jack up tower crane?
Looking for technical personnel to install, you fuck what heart?.
Q:Is the tower crane a special type of work?
The crane driver, scaffolder, welders and other special types are
Q:What should be included in the disassembly plan of the tower crane?
- 3 - tower crane demolition special program should include the following1. General situation of engineering;2, the tower crane position of the plane and elevation;3. Disassembly order;4, unit weight and hanging point position;5, remove the auxiliary equipment types, performance and arrangement position;6, the power set;7, the construction personnel configuration;8. Rigging and special tools;9, major sources of risk and safety technical measures;10, emergency plans, etc..Note: (1) the special construction plan for the installation and disassembly of tower cranes shall be examined and approved by the units, technology, safety, equipment and other departments, and shall be implemented after approval by the supervisor.(2) the contents and requirements of the special construction scheme for tower crane installation;Compiled from the "building construction tower crane installation, use and disassembly safety technical regulations" JGJ196-2010, please refer to the implementation. Attached: 1, Zhifu Wanda Plaza Tower Crane installation program 2, Muping District Cultural Center project PT7528 tower crane demolition program
Q:What is the power of a tower crane? Five
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q:What is the scrap standard of tower crane hook?
The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.
Q:When the tower crane top height is more than meters
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."
Q:What does tower crane jacking up mean?
First of all, the boom and trim balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.Jiangsu Zhendong port machinery manufacturing heavy port machinery is a professional manufacturer of mechanism
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;
Q:How much height should tower crane work at M?
High building one meter high voltage line to keep the relevant national standard to ensure the forearm and the adjacent adjacent tower crane tower crane standard section has a safe distance of 2 meters, big boom high high tower mechanism area covering more than one meter, the end will need to receive from the nearest cab hook.
Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
2 tower cranes (tower crane) referred to as tower cranes, also known as tower cranes, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..Has a good safety device 3, tower crane, such as lifting weight limiter, amplitude limiter, height limiter and load torque limiter limiting device, and travel limit switchestower lights wind instrument, wind clip rail device ladders athletic supporter circlewalkways and railings. The driver's cab is comfortable, easy to operate, with good vision and perfect communication facilities.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range