FUXIANG Tower Cranes TC6014A (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Type and specification of tower crane,
Type of tower craneAccording to the Ministry of construction ZBJ04008-88 "building machinery and equipment product model preparation method", the tower crane model composition as follows:QTZ, 80H, QTZ------ group, type, characteristic code80------ maximum lifting torque (ton M.)H------ update, variant codeAmong them, the updating code name is expressed in Chinese phonetic alphabet (upper case printed); the main parameter code is expressed in the Arabia numeral. It is equal to the rated lifting torque of the tower crane (unit kN * m) * 10-1;Group, type, characteristic code meaning is as follows: rotary tower crane on QTQTZ slewing tower craneRotary tower crane under QTAQTK rapid installation tower craneQTP climbing tower craneQTG fixed tower craneQTQ automobile tower craneQTL tire tower craneQTU crawler tower craneIn addition, now some tower crane manufacturers, according to foreign standards, with tower crane's largest arm length (m) and arm end (maximum range) can lift the rated weight (KN) two main parameters to mark tower crane model. Such as "QTZ100" in another mark "TC5613", its significance:T C 5613 T------ crane English first letter (Crane) C------ tower English first letter (Tower) 56------, maximum arm length 56m 13------ arm, lifting weight 13KN (1.3 tons)
Q:Is tower crane a tower crane?
Yes, the tower crane is commonly known as the "standard" in the industry. It is called tower crane.
Q:What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel. Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q:What is the difference between a jack up tower crane and a fixed tower crane?
Tower cranes, because there is no running mechanism, so tower crane can not do any movement. Fixed tower crane can be divided into the tower height invariant and Jack up. That is, the jack up tower crane is a kind of fixed tower crane.
Q:What should be included in the disassembly plan of the tower crane?
- 3 - tower crane demolition special program should include the following1. General situation of engineering;2, the tower crane position of the plane and elevation;3. Disassembly order;4, unit weight and hanging point position;5, remove the auxiliary equipment types, performance and arrangement position;6, the power set;7, the construction personnel configuration;8. Rigging and special tools;9, major sources of risk and safety technical measures;10, emergency plans, etc..Note: (1) the special construction plan for the installation and disassembly of tower cranes shall be examined and approved by the units, technology, safety, equipment and other departments, and shall be implemented after approval by the supervisor.(2) the contents and requirements of the special construction scheme for tower crane installation;Compiled from the "building construction tower crane installation, use and disassembly safety technical regulations" JGJ196-2010, please refer to the implementation. Attached: 1, Zhifu Wanda Plaza Tower Crane installation program 2, Muping District Cultural Center project PT7528 tower crane demolition program
Q:What does "automatic tower crane" mean less than 100 tons per metre?
When you are working on this crane, the weight between the weight and the weight to the horizontal distance of the crane Center shall not be greater than 100 tons.For example, if the weight and crane center level distance is 10 meters, the maximum weight is 10 tons; if it is 20 meters, the maximum lifting weight is 5 tons; if it is 40 meters, the maximum lifting weight is 2.5 tons.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
If you set the tower crane foundation in the foundation pit, which is based on another piling, the general is to help the wall of the tower crane (unless your project in the free height under it), so far away from the foundation by the wall distance set.The two tower cranes are all supported by piles and steel lattice columns in the foundation pit. The distance is determined by the distance between the outer edge of the main structure and the supporting wall.
Q:What does tower crane jacking up mean?
First of all, the boom and trim balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.Jiangsu Zhendong port machinery manufacturing heavy port machinery is a professional manufacturer of mechanism
Q:What are the climbing claws on the tower crane?
Climbing is lifting work cylinder claw pole on the standard main limb rod bearing points of the.
Q:What does "jack up" tower crane 1000KNm mean?
The Greek letter of torque is tau. The concept of torque originates from Archimedes's study of leverage. Rotational torque, also known as torque or torque. The torque can change the rotational motion of an object. Pushing or pulling involves force, while torsion involves torque. The moment is equal to the cross product of the radial vector and the force.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range