FUXIANG Tower Cranes TC5510B (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

The flat top tower crane is more and more popular among customers with its beautiful appearance and quick and safe disassembly, and its application range is also expanded constantly. The PT series product is the new product with domestically advanced level and capability of international market competition, and the main models include PT5510-6t, PT7023-12t and PT7528-18t.

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When the tower crane top height is more than meters
Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.
Q:Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163.comHttp://www.cqybjs.com (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
Q:What is the insulation resistance of tower crane?
Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:What are the requirements for jack up and plus section of jack up tower crane?
Ask you experts on the construction site of self lifting tower cranes how to install?. Is it like lifting a jack up of a car jack and hanging it in the middle when it's empty?
Q:What parameters are lifting machines called large equipment? 200
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
Q:What should be included in the disassembly plan of the tower crane?
- 2 - (1)Project and safety supervisor with safety certificate and mechanical management personnel.(2)Construction crane with qualification certificate for construction operationMachinery installation, disassembly, lifting, signal workers, electricians, lifting drivers, cable operators and other special operations personnel.The above constructors shall fill in the name, type of work and qualification number of the constructors.11 、 installation procedure and safety quality requirement;In strict accordance with the tower crane product specifications, installation procedures and safety quality requirements of the implementation of the organization of safety construction technical disclosure and signature confirmation.12, installation self-test;After installation, the installation of the unit with the installation quality testing, debugging safety device and complete self-test report.13, major sources of risk and safety technical measures14, emergency plans and so on
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
If you set the tower crane foundation in the foundation pit, which is based on another piling, the general is to help the wall of the tower crane (unless your project in the free height under it), so far away from the foundation by the wall distance set.The two tower cranes are all supported by piles and steel lattice columns in the foundation pit. The distance is determined by the distance between the outer edge of the main structure and the supporting wall.
Q:Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q:How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q:Tower crane four limit, two insurance, two insurance what is that?
Four limit: torque, ultra high, variable amplitude, walking limit device. Two insurance: hook insurance and reel safety device.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range