FUXIANG Tower Cranes PT7023A (Flat-Top)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

 

 

Tower Cranes (Flat-Top)  

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting heightm

Lifting capacityt

Work rangem

Work rangem

Lifting capacityt

PT5510

6

12.7

55

1

40

PT7023

12

18.1

70

2.3

50

PT7528

18

16.8

75

2.8

60

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane (tower crane)
In the form of the structure for the tower type, flat type and movable arm type. The model can be divided into QTZ63 suspension, QTZ80 crane, QTZ125 crane, QTZ crane, 315 crane and so on according to the moment division. Now used to arm length + tip weight of the way named, for example, 5513, that is, the longest length of 55 meters arm, the tip of the largest weight of 1.3 tons.
Q:Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley. At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q:The role of slewing limiter in tower cranes is limited
The crane or winch motor winding rope arranged on the roller loose, hoisting large demolition, resulting in the large load fast rope rope cut into bundles, causing fast rope severe jitter, vulnerable to instability, the results often appear to work and stop dangerous, can not stop the embarrassing situation.
Q:When building tall buildings, where is the bottom of the tower crane installed?
It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:What are the necessary safety devices on a tower crane?
(1) lift height limit position limiterFor cranes with variable boom angles, the lifting motion must be stopped immediately when the top of the lifting device rises to the 8OOmm at the lower end of the boom.For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately.(2) lifting moment limiter and maximum lift limiter;When the lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped.If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value.When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.
Q:What is the free height of a tower crane?
The free height of large tower cranes can be up to 100 meters.
Q:Is tower crane a tower crane?
Yes, the tower crane is commonly known as the "standard" in the industry. It is called tower crane.
Q:Tower crane; command; gesture
8. the hook falls slightly: the arm extends to the side, front and bottom, with the angle of the body about 30 degrees, palm down, with the wrist as the axis, repeatedly swinging downward palm.9. hook horizontal move slightly: small arm toward the side of the natural extension, fingers together, palms outward, in the direction of the load should be running, repeat the slow horizontal movement.10., micro range: double arm bent, extended to one side, five fingers straight, palms relative, and the distance between the load and the distance to move.11. directions of landing: five fingers unbend, point out the position where the load should fall.12. stop: small arm horizontally placed in front of the chest, fingers outstretched, palms down, horizontal swing to the side.13. emergency stop: two small arm level placed in his fingers outstretched, palms downwards, while waving to the level of both sides.14. end of work: stretch your hands and fingers and cross over at the front of your forehead.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range