FUXIANG Tower Crane TC5510C (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many meters of cranes should be in accordance with the anemometer?
In accordance with national regulations, outdoor cranes need to install anemometer.Specific provisions"GB6067.1-2010 crane safety regulations", 9.6.1 anemometer and wind speed alarm9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be located upwind of the upper part of the crane.9.6.1.2 high speed crane for outdoor operation should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:The role of slewing limiter in tower cranes is limited
The crane or winch motor winding rope arranged on the roller loose, hoisting large demolition, resulting in the large load fast rope rope cut into bundles, causing fast rope severe jitter, vulnerable to instability, the results often appear to work and stop dangerous, can not stop the embarrassing situation.
Q:What are the "2 magnification" and "4 magnification" mentioned in the lifting characteristics table of tower cranes?
Popular saying: "car to hook this section of vertical distance, you see 4 wire rope is 4 magnification, you see 2 wire rope is 2 magnification.".
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Valuation, tower crane concrete foundation pouring and maintenance costs are included in the tower crane rental costs, not separately assessed.
Q:What kind of tower cranes are available? How about the scope of all kinds of tower cranes?
Tower crane is divided into fixed tower crane, mobile tower crane, jack up tower craneThe mobile tower crane is divided into track type, tire type and automobile typeThe jack up tower crane is divided into two parts: internal climbing type and attached typeUsage: loading and unloading concrete by hanging tank for general construction and installation
Q:What windproof devices should be set up for crane work?
4. windproof anti-skid safety deviceThe utility model is a safety device for preventing the crane of the open-air work from sliding along the track under the action of strong wind, and the outdoor working track type crane shall be installed. The safety function of the utility model is that when the crane encounters the maximum wind force in the non working state, the crane is not blown to prevent the crane from overturning at the end of the rail. Common windproof devices include rail clamps, anchoring devices, and iron shoes.(1) rail clamping device: it is widely used in all kinds of outdoor track crane, its working principle is to use the two sides of a clamp rail head, the crane is fixed on the track through the combination of the clamping force, the crane can not slip. The design requirements of rail clamp, clamping force of rail clamp must be greater than the crane sliding force, to ensure that the local maximum wind, crane stays closed; rail tongs should rely on device components own weight or spring, and should not only rely on the driving effect of the power of the driving device, to to prevent the power supply is interrupted, the rail clamping device does not work; power driven rail clamping action should be behind the operation mechanism of brake action violently to eliminate possible crane brake.(2) anchor device: it uses a bolt or a flashboard device, a chain or a top pole to connect the crane and the track foundation into one body, and is used for fixing the crane in the big storm when not working. Since the anchor device can only be located in a certain position of the track, the crane can be anchored to this position, which is not suitable for immediate weather protection in an emergency.(3) iron shoes: it is a wedge device, when used, the wedge-shaped tongue inserted between the wheel tread and rail top surface, the iron shoes of the slope constitute the resistance to sliding wheels.
Q:Where can I get the tower crane manufacturing permit?
Zhengzhou China enterprise management consulting company, oh, my uncle company for tower crane manufacturing license is to find them, they are not only a team of professional, and service is very thoughtful, efficient.
Q:What is the scrap standard of tower crane hook?
The hook shall be scrapped at any time in the following circumstances:Crackle;The wear of the dangerous section is 10% of the original size;The opening ratio is increased by 10% than the original size;The twist of the hook is over 10 degrees;The dangerous section of the hook or the neck of the hook produces plastic deformation;The hook thread is corroded;When the hook bushing is worn at 50% of the original size, the bushing shall be replaced;The mandrel shall be replaced when the hook mandrel is worn at 5% of the original size.
Q:Tower crane four limit, two insurance, two insurance what is that?
Four limit: torque, ultra high, variable amplitude, walking limit device. Two insurance: hook insurance and reel safety device.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(6) the crane of lightning protection and anti electromagnetic wave sensing device shall be equipped with lightning protection device and anti electromagnetic drape induction measures according to the actual situation and shall be equipped with crane with a hinge height of more than 50m at the root of the boom. (7) the tower crane should be installed to prevent the rotary overload limit torque coupling (8) anti off rope device to prevent the wire rope from the working position (9) rope breaking resistant device to prevent car luffing rope break free sliding trolley (10) anti broken shaft device to prevent car car wheel shaft broken after the fall (11) brake parts that is the work device is a safety device

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range