FUXIANG Tower Crane TC50103A(Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Detailed parameters of QTZ80 tower crane 50
The weight of the whole machine is 36.1 tons (independent height). Its balance weight is 15 tons, and the balance weight is 11.82 meters. The boom weight is 5.72 tons. It is necessary to use planetary gear.Usually use two rotary speed reducer of 8000 nm.
Q:Notice of tower crane
Installation condition of 3.2 tower crane3.2.1 tower crane has special equipment manufacturing license, product certification, manufacturing supervision and inspection certificate, the tower crane manufactured abroad should have product certification, and has been in the construction administrative departments for registration.3.2.2 tower cranes shall be of complete structure and conform to the provisions of GB5144 "safety regulations for tower cranes".3.2.3 under the following circumstances, tower cranes are not allowed to use:If the state has been eliminated from the designated period of time, exceeding the prescribed service life assessment, the safety devices and safety facilities can not meet the safety and technical standards of the state or industry; there is no complete safety technical file.3.2.4 tower cranes must be maintained and fully checked before they are installed. Structural parts with visible cracks, severe corrosion, overall or partial deformation, connecting shafts (pins), Kong You, severe wear and tear should be repaired or replaced, in accordance with the provisions of the installation.3.2.5 tower crane foundation should meet the requirements of the use manual, the carrying capacity of the foundation must meet the requirements of tower crane design, installation should be carried out before the hidden project acceptance, qualified before installation. Slope and drainage facilities should be built around the foundation.The track foundation and track laying of 3.2.6 walking tower crane shall be carried out according to the instruction manual and shall comply with the provisions of GB5144.
Q:How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q:What are the lifting moment requirements for tower cranes?
2 tower cranes (tower crane) referred to as tower cranes, also known as tower cranes, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..Has a good safety device
Q:Tower crane railing height is greater than or equal to meters
The height of the railing is determined by the operation specification at height. The upper rod height is 1.0~1.2m, and the lower rod height is 0.5~0.6m.
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Calculated according to actual concrete quantity. According to the design plan of the visa and construction organization.
Q:Examples of filling and acceptance forms for tower cranes and examples of filling in.
The 1 conclusion is "qualified" project, fill out the "tick".2, the conclusion is "unqualified" project, fill in "x"". Part of the "unqualified" sub item should also be painted on its number *".
Q:What is a TQ80 tower crane?
To put it simply, QTZ is updated than the TQ model, and the TQ series first appeared in 70s, and the QTZ series came out in the 80,90. Various parameters must be more advanced than TQ.
Q:What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical. The higher the rise, the larger the angle, the smaller the radius.I wonder if it's this angle? Hope to be of help to you,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range