FUXIANG Tower Crane TC50103(Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:why should i look forward to reading stephen crane?
Well, you know he lived in the late 1800s, so you probably have an idea of what his poetry will sound like. Then you read some of it, and the effect is sort of like walking into what you think is going to be a prissy hair salon and being whacked over the head with a bunch of bananas wielded by a glow-in-the-dark green monkey from Jupiter. Crane's stuff is that weird. And I mean that in a good way.
Q:what is a good name for a english three reaserch paper on the author stephen crane?
It depends on what the paper is about. I could suggest a title such as The Influence of John Locke's Theory of Personal Identity on 'The Red Badge of Courage,' but if your paper is about Crane's portrayal of the military hierarchy instead, that would be an incredibly stupid title. So nobody can really answer your question.
Q:Origami crane word problem?
1/5 + 1/x = 1/3 == x = 15/2 = 7.5 h answer : 7.5 hours ++++++++++++++++++++
Q:Estimating crane size...?
well I'm not sure but need to over estimate for safety cause there are all ways mitigating forces @ play when using cranes be safe first dude you dint want to be sued for being cheap and if yo do good work word will get around
Q:What is the difference between an egret and a crane?
an egret is any of several herons and several of which develop milky white plumes during the breeding season,some herons are called egrets. Cranes are a family of large, long-legged and long-necked birds Unlike the similar-looking but unrelated herons, cranes fly with necks outstretched, not pulled back. Cranes’ necks are a shorter than those of heron.Herons curve their necks into an “S” shape and when they are flying they pull them totally back, while cranes necks’ stick straight out. Cranes also have shorter beaks than herons.
Q:How can we attract Sand Hill Cranes to our bird feeder?
They like shallow swampy areas with medium to tall grasses
Q:Does anyone have any info on John B. Crane?
Do you mean the Lecturer John B. Crane of the Redpath Chautauqua Collection? Thats the only one I know.
Q:What should I do with 1000 paper cranes?
Well if you don't want to keep them you can look up organizations that wish to use them for a project. There are a lot for Japan, one that was organized recently for the tsunami was accepting cranes for a fundraiser (every crane sent in earned a certain amount of money with the finished collection being placed in an art museum). I know some hospitals accept cranes for the children's ward, that is what my class did in elementary school we made 1000 and the hospital used them as decorations for the Christmas tree. Then there are individual projects that people start online with which they are accepting cranes to fulfill the one thousand mark for people they know who are sick etc. (relates to the story behind the 1000 paper cranes practice). As a side note if you contact the organization you find a lot of the time the shipping is prepaid you just have to drop them off at the post office. Hope this helps.
Q:What are the requirements for jack up and plus section of jack up tower crane?
Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
Q:Dawkings' Boeing crane. How did it arise, and continue to work?
There are cranes, anchored to the ground which can build concepts up. However, the idea of a sky crane is how someone builds a concept from thin air. The ultra cosmic sky crane built it. That way you don't have to figure out a realistic way of building a theory.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range