FUXIANG Tower Crane TC5008 (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

echnology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers

 

item

unit

parameter

max.hoist load

2 rate

t

8

4 rate

16

min.working radius

m

3.2

max.working radius

m

70

65

60

55

Rated hoist moment

2 rate

kN.m

2350

2400

2450

2500

4 rate

2100

2150

2200

2250

Hoist height

free-standing

48

Acnhorging

2 rate

183

4rate

93

Hoist speed

2 rate

m/min

0~63

0~31.5

4 rate

0~31.5

0~15.7

hoist mechinism power

KW

55

slewing speed

r/min

0~0.7

trolley speed

m/min

0~65

top-rising speed

m/min

55

outline dimension

 

height of the total tower crane

m

61.4

end of the boom to slewing center

71.7 (66.7  61.7  56.7)

Balance boom to slewing center

19.2

weight

 

structure weight (free-standign)

t

71.63

balance weight

27.325  23  19.6

working temperature

-20~+40

basic working wind pressure

Pa

250

basic non- working wind pressure

Pa

1100

power supply parameter

50Hz

~380V±10%

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a tower crane without a collector?
Without the collector, the main cable of the tower crane directly reaches the power distribution cabinet after turning.
Q:Is tower crane a tower crane?
Yes, the tower crane is commonly known as the "standard" in the industry. It is called tower crane.
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:Why are there extra placards attached to the tower crane tower?
Because the span of the base is short, the tower is efficient, and the billboard is easy to cause the tower to overturn or bend.
Q:What are the "2 magnification" and "4 magnification" mentioned in the lifting characteristics table of tower cranes?
Popular saying: "car to hook this section of vertical distance, you see 4 wire rope is 4 magnification, you see 2 wire rope is 2 magnification.".
Q:Under what circumstances does a tower crane require third party testing?
New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau
Q:Which kind is better, gantry crane or tower crane?
Each has advantages, the use of different conditions, the use of different cranes, tower cranes can not move, but the lifting height can be very high, the door machine has tracks can be vertical and horizontal movements, lifting height, tower crane is not high.
Q:What are the four major moving mechanisms of a tower crane?
Tower crane refers to the fuselage for the tower frame, can walk along the track, a crane equipped with rotary arm. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system.
Q:What is the difference between lifting height of tower crane and independent height?
It is not the kind of independent highly rigid or flexible attachment function when the tower reached the maximum height, lifting height of the tower is at the maximum height and the minimum amplitude in hook, hook support face datum allows the maximum vertical distance of tower crane.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(6) the crane of lightning protection and anti electromagnetic wave sensing device shall be equipped with lightning protection device and anti electromagnetic drape induction measures according to the actual situation and shall be equipped with crane with a hinge height of more than 50m at the root of the boom. (7) the tower crane should be installed to prevent the rotary overload limit torque coupling (8) anti off rope device to prevent the wire rope from the working position (9) rope breaking resistant device to prevent car luffing rope break free sliding trolley (10) anti broken shaft device to prevent car car wheel shaft broken after the fall (11) brake parts that is the work device is a safety device

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range