FUXIANG Tower Crane TC4208 (Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A crane lifts a load of 3000 kg to a height of 8.5 meters in 15 seconds?
I wonder if you saw my response to the additional question you asked of my previous answer to this question .. To see my response .. go to your previous question and click on comment in the Action Bar (below 'Asker's Rating')
Q:How do cranes get from one construction site to another without hitting streetlights, wires, car, buildings?
They dodge by the stuff as they fly along. Duhhh
Q:How do you win a PS3 at crane?
The crane machines work in such a way as to only make the claw strong enough to hold prizes after a certain amount of attempts so as to limit the amount of prizes taken.
Q:What happened to Seneca Crane in the Hunger Games?
In the end of the first book, he was put in a room with a bowl in the middle. In the bowl, there were berries. Very deadly berries. This is significant because in the arena, Peeta and Katniss threatened the Capitol that they would eat them and kill themselves. If that happened, there would be no victor. President Snow wanted Seneca Crane to kill them. But Seneca Crane let there be two victors, instead of one or none. So, back to the point. Seneca Crane was punished because he couldn't listen to the president's orders. So, he was put in a room with no food, water, etc. If he got hungry he, he had to eat the berries. So, he died. I don't know how you missed that, but I hope this helps! :) I LUV U PEETA!
Q:kelsey grammer as dr. frasier crane or richard belzer as det. munch from 'homicide' and 'law and order: svu' ?
It's definately Frasier Crane. His character was introduced on Cheers way before the SVU franchise began.
Q:STEPHEN CRANE! what are the literary techniques he uses the most?
Stpehen Crane used interesting literary techniques such as colorful metaphors which can easily be identified in eg like knowing eyes which represent the people of Dunnet (ammons, 84). Another literary technique he uses often is irony which is seen in chapter with Mrs. Todds variety of personality which shows how Mrs. Todd has this varied personality(eden, 141). Other literary techniques shown are comparisons and contradictions, dramatic personification and powerful paradox.
Q:Air Hogs Fly crane wont fly?
Good okorder.com, Funtastic Customer Service Team
Q:How do they put up tower cranes?
This Site Might Help You. RE: How do they put up tower cranes? How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
Q:how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q:Is Air Crane a Trademark-able name for a Rigid Airship used primarily for moving heavy objects from above?
It's okorder.com/.... Judging by the fact that a Google search results in many different companies/aircraft that incorporate the term 'air crane', I would say so. But it seems that the term is usually associated with heavy-lift rotorcraft. It also appears that the term is in the public domain. So, you could call it 'JV's Air Crane' or something like that. I've Googled SkyLift, AirLift, Zeplift- all taken However, DiriLift, DirigiLift,and ZepCrane yielded no results. *I relinquish all rights to these terms

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range